Difference between revisions of "Run Meeting: Nov 13th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 9: Line 9:
  
 
==Summary of past 24h:==
 
==Summary of past 24h:==
Major Problems:
 
-After system recovery during day shift yesterday, MCC started to bring the machine back online. During this process the South linac PSS system dropped. https://logbooks.jlab.org/entry/3625100 -Lost 2.5 hours
 
-Shortly after this, PSS dropped again - Lost 3.5 hours
 
-Then from 22:45 till 04:30, numerous down time events https://accweb.acc.jlab.org/dtm/all-events?incidentId=5431
 
-Around 3:30 the truck ramp door opened https://logbooks.jlab.org/entry/3625300!!! Closed around 5
 
- From 6:30 till now, 0R08 BLA Trips
 
  
The end of owl on Monday till the end of owl today, we have received about 12 Minutes of quality beam on target.  
+
*After system recovery during day shift yesterday, MCC started to bring the machine back online. During this process the South linac PSS system dropped. https://logbooks.jlab.org/entry/3625100 Lost 2.5 hours
Then about 1 hour of beam through day shift today.  
+
*Shortly after this, PSS dropped again - Lost 3.5 hours
 +
*Then from 22:45 till 04:30, numerous down time events https://accweb.acc.jlab.org/dtm/all-events?incidentId=5431
 +
*Around 3:30 the truck ramp door opened https://logbooks.jlab.org/entry/3625300!!! Closed around 5
 +
* From 6:30 till start of day shift, 0R08 BLA Trips
 +
 
 +
*From the end of owl on Monday till the end of owl today, we have received about 12 Minutes of quality beam on target.  
 +
*Then about 1 hour of beam through day shift today.
  
 
==Current Plan==
 
==Current Plan==

Revision as of 16:16, 13 November 2018

Back to:

Main Page
Daily Run Meetings

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Jason Bane

Summary of past 24h:

  • From the end of owl on Monday till the end of owl today, we have received about 12 Minutes of quality beam on target.
  • Then about 1 hour of beam through day shift today.

Current Plan

Take data on Hydrogen at the 3H kinematics. 11/14 day shift, change to 3H at these same kinematics.

Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934