Difference between revisions of "Run Meeting: Oct 25th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 28: Line 28:
 
- no beam <br />
 
- no beam <br />
 
- controlled access <br />
 
- controlled access <br />
- Jessie, Jack and Heidi entered to check LQ3 issue.
+
- Jessie, Jack and Heidi entered to check LQ3 issue.<br />
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just for investigating its behaviour.   
+
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just for investigating its behaviour.  <br />
- ~14:30 Hall in beam permit
+
- ~14:30 Hall in beam permit<br />
 
 
  
 
==Plan:==
 
==Plan:==

Revision as of 14:42, 25 October 2018

Back to:

Main Page
Daily Run Meetings

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Carlos Ayerbe

Summary of past 24h:

Accelerator

- beam studies
- tune beam ~20:00-01:00
- Phase Studies 2:00 -...

Swing shift

- elastics runs from tune beam

Owl shift

- finish elastics
- LQ3 quench

Day shift

- no beam
- controlled access
- Jessie, Jack and Heidi entered to check LQ3 issue.
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just for investigating its behaviour.
- ~14:30 Hall in beam permit

Plan:

- expected beam at Swing shift.


Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653