Difference between revisions of "Run Plan From Run Coordinator"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 3: Line 3:
 
*Remove Sieve from LHRS
 
*Remove Sieve from LHRS
 
*Run Dummy with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA  -- 2 million events each (~15 minutes @ 2kHz)
 
*Run Dummy with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA  -- 2 million events each (~15 minutes @ 2kHz)
 +
*FADC threshold check
 
*Run Multifoil with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA  -- 1 million events each (~15 minutes @ 2kHz)
 
*Run Multifoil with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA  -- 1 million events each (~15 minutes @ 2kHz)
 
*'''When gas cell running is approved:'''
 
*'''When gas cell running is approved:'''

Revision as of 12:53, 15 December 2017

Dec 15 Day Shift

  • Remove Sieve from LHRS
  • Run Dummy with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 2 million events each (~15 minutes @ 2kHz)
  • FADC threshold check
  • Run Multifoil with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 1 million events each (~15 minutes @ 2kHz)
  • When gas cell running is approved:
    • call RC
    • begin target boiling study [1]

Other Links

Brief but reflects the exact runplan.


Documentation and details. Could be out-of-date. Please always check with run coordinator and student experts.