Difference between revisions of "Run Plan From Run Coordinator"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 1: Line 1:
 +
 +
=Jan 12 Owl=
 +
*Follow Startup Procedure: https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning
 +
* HALOG EVERYTHING
 +
*
  
 
=Jan 11 Swing=
 
=Jan 11 Swing=

Revision as of 02:06, 12 January 2018

Jan 12 Owl

Jan 11 Swing

  • Monitor the target
  • Check that RHRS and LHRS are at 15.577deg and 3.1 GeV
  • Take Cosmics on both arms until beam setup begins
  • coordinate with MCC for 5th pass beam setup!

Dec 16 Owl Shift

  • Finish the Boiling Study
  • ~1am: access to move LHRS to 22deg
  • Run on 3H, 3He, 1H, 2H, and empty cell until Day Shift

Dec 15 Swing Shift

  • See WhiteBoard
  • Boiling Study: [1]


Dec 15 Day Shift

  • Remove Sieve from LHRS
  • Run Dummy with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 2 million events each (~15 minutes @ 2kHz)
  • FADC threshold check
  • Run Multifoil with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 1 million events each (~15 minutes @ 2kHz)
  • Access begins at 1pm https://logbooks.jlab.org/entry/3505097
  • When gas cell running is approved:
    • call RC
    • begin target boiling study [2]

Other Links

Brief but reflects the exact runplan.


Documentation and details. Could be out-of-date. Please always check with run coordinator and student experts.