Difference between revisions of "Run Plan From Run Coordinator"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 8: Line 8:
 
*Continue with the Commissioning Plan: [https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning]
 
*Continue with the Commissioning Plan: [https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning]
 
**Do not skip the bullseye scan (even though we took one harp scan earlier today)
 
**Do not skip the bullseye scan (even though we took one harp scan earlier today)
 +
**Doug will do the Arc energy measurement sometime this weekend. (Don't call him for this in the middle of the night...)
 
*If startup procedure is completed, take 5uA runs, 30 min each:
 
*If startup procedure is completed, take 5uA runs, 30 min each:
 
**Single-Foil Carbon, raster off
 
**Single-Foil Carbon, raster off

Revision as of 21:45, 12 January 2018

Jan 12 Swing

  • Hall Access
  • Collimator edge-finding
  • clock run for BPM sanity check
  • Bogdan's raster target edge-finding sanity check
  • carbon hole finding/centering (see how close we can get, may need to ask for BPMBx != BPMAx in order to avoid collimator)
  • Continue with the Commissioning Plan: [1]
    • Do not skip the bullseye scan (even though we took one harp scan earlier today)
    • Doug will do the Arc energy measurement sometime this weekend. (Don't call him for this in the middle of the night...)
  • If startup procedure is completed, take 5uA runs, 30 min each:
    • Single-Foil Carbon, raster off
    • Single-Foil Carbon, raster on
    • Multi-Foil Carbon, raster off
    • Multi-Foil Carbon, raster on
  • If still waiting for gas cell permission:
    • Dummy Target, 10uA, raster on

Jan 12 Owl


Jan 11 Swing

  • Monitor the target
  • Check that RHRS and LHRS are at 15.577deg and 3.1 GeV
  • Take Cosmics on both arms until beam setup begins
  • coordinate with MCC for 5th pass beam setup!

Dec 16 Owl Shift

  • Finish the Boiling Study
  • ~1am: access to move LHRS to 22deg
  • Run on 3H, 3He, 1H, 2H, and empty cell until Day Shift

Dec 15 Swing Shift

  • See WhiteBoard
  • Boiling Study: [2]


Dec 15 Day Shift

  • Remove Sieve from LHRS
  • Run Dummy with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 2 million events each (~15 minutes @ 2kHz)
  • FADC threshold check
  • Run Multifoil with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 1 million events each (~15 minutes @ 2kHz)
  • Access begins at 1pm https://logbooks.jlab.org/entry/3505097
  • When gas cell running is approved:
    • call RC
    • begin target boiling study [3]