Difference between revisions of "SRC Production Run"

From Tritium Experiments Group
Jump to navigation Jump to search
m
Line 116: Line 116:
 
== 2N-SRC Isospin and 3N-SRC (2018 Run) ==
 
== 2N-SRC Isospin and 3N-SRC (2018 Run) ==
  
== [[Physics Projection]]  ==
+
== [[Physics Projection]] (in proposal) ==

Revision as of 21:00, 14 December 2017

Back to 2017 Full Run

Back to Tritium Main

  • Quasi-Elastic and Elastic (HRS-L Only, December 2017 Run):
  • 2N-Isopin and 3N-SRC (2018 Run):

Quasi-Elastic and Elastic (December 2017 Run)

E0=2.2 GeV

Run-Set Theta (Degree) Ep (GeV/c) Physics Targets Total Events Comments
Kin1.1 15 2.14 Elastic H3, He3, D2, H1, Empty, Dummy
Kin1.2 15 2.04 QE H3, He3, D2, H1, Empty, Dummy
Kin2.1 17 2.13 Elastic H3, He3, D2, H1, Empty, Dummy
Kin2.2 17 2.00 QE H3, He3, D2, H1, Empty, Dummy Share the same data set as the Boiling Study
Kin3.1 22 2.08 Elastic H3, He3, D2, H1, Empty
Kin3.2 22 1.88 QE H3, He3, D2, H1, Empty
Kin4.1 26 2.04 Elastic H3, He3, D2, H1, Empty
Kin4.2 26 1.78 QE H3, He3, D2, H1, Empty
Kin5.1 30 1.99 Elastic H3, He3, D2, H1, Empty
Kin5.2 30 1.67 QE H3, He3, D2, H1, Empty

2N-SRC Isospin and 3N-SRC (2018 Run)

Physics Projection (in proposal)