SRC Production Run

From Tritium Experiments Group
Revision as of 13:49, 4 December 2017 by Yez (talk | contribs) (Created page with "* <b>H3 Target</b> <table border="1" style="width:80%"> <tr> <td>Run number</td> <td>Target</td> <td>Beam Current</td> <td>Raster Size </td> <td>E<SU...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 22.5uA 2x2 cm 4.3 2.6 17
  • He3 Target
* H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 20uA 2x2 mm 4.3 2.6
* H3 Target
Run number Target Beam Current Raster Size
Carbon-Foil 20uA 2x2 mm 4.3 2.6
* H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 22.5uA 2x2 cm 4.3 2.6 17
H3 20uA 2x2 cm 4.3 2.6 17
H3 12uA 2x2 cm 4.3 2.6 17
Carbon-Foil 20uA 2x2 mm 4.3 2.6
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 22.5uA 2x2 cm 4.3 2.6 17
H3 20uA 2x2 cm 4.3 2.6 17
H3 12uA 2x2 cm 4.3 2.6 17
H3 7uA 2x2 cm 4.3 2.6 17
H3 3uA 2x2 cm 4.3 2.6 17
H3 7uA 2x2 cm 4.3 2.6 17
H3 3uA 2x2 cm 4.3 2.6 17
Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 22.5uA 2x2 cm 4.3 2.6 17
H3 20uA 2x2 cm 4.3 2.6 17
H3 12uA 2x2 cm 4.3 2.6 17
H3 7uA 2x2 cm 4.3 2.6 17
H3 3uA 2x2 cm 4.3 2.6 17
He3 22.5uA 2x2 cm 4.3 2.6 17


  • C12 target for a normalization check for beam-current dependent rate check (Share the data set with BCM calibration date.
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 22.5uA 2x2 mm 4.3 2.6 17
  • He3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
He3 22.5uA 2x2 cm 4.3 3.82 17
  • Empty-Target-Cell for checking the aluminium contamination from end-cups in the gas
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Empty-Cell 22.5uA 2x2 mm 4.3 3.82 17


  • C12 target for a normalization check for beam-current dependent rate check (Share the data set with BCM calibration date.
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Multi-C12 22.5uA 2x2 mm 4.3 3.82 17