SRC Production Run

From Tritium Experiments Group
Revision as of 20:50, 14 December 2017 by Yez (talk | contribs) (→‎E0=2.2 GeV)
Jump to navigation Jump to search

Back to 2017 Full Run

Back to Tritium Main

Physics Projection

projected data for X>1

  • Quasi-Elastic and Elastic (HRS-L Only, December 2017 Run):
  • 2N-Isopin and 3N-SRC (2018 Run):

Quasi-Elastic and Elastic (December 2017 Run)

E0=2.2 GeV

Run-Group Theta (Degree) Ep (GeV/c) Physics Targets
Kin1.1 17 2.13 Elastic Total Events H3, He3, D2, H1, Empty, Dummy
Kin1.2 17 2.00 QE H3, He3, D2, H1, Empty, Dummy
Kin2.1 22 2.08 Elastic Total Events H3, He3, D2, H1, Empty
Kin2.2 22 1.88 QE H3, He3, D2, H1, Empty
Kin3.1 26 2.04 Elastic Total Events H3, He3, D2, H1, Empty
Kin3.2 26 1.78 QE H3, He3, D2, H1, Empty
Kin4.1 30 1.99 Elastic Total Events H3, He3, D2, H1, Empty
Kin4.2 30 1.67 QE H3, He3, D2, H1, Empty

2N-SRC Isospin and 3N-SRC (2018 Run)

  • H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 22.5uA 2x2 mm 4.3 3.0 17.0
  • He3 Target
ulti-C12 Optics Targe ulti-C12 Optics Targe
Run number TargetBeam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
He3 22.5uA 2x2 mm 4.3 3.0 17.0
  • Empty-Cell
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Empty-Cell 22.5uA 2x2 mm 4.3 3.0 17.0
  • Multi-C12 Optics Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Multi-C12 22.5uA 2x2 mm 4.3 3.0 17.0