SRC Production Run

From Tritium Experiments Group
Revision as of 20:59, 14 December 2017 by Yez (talk | contribs)
Jump to navigation Jump to search

Back to 2017 Full Run

Back to Tritium Main

  • Quasi-Elastic and Elastic (HRS-L Only, December 2017 Run):
  • 2N-Isopin and 3N-SRC (2018 Run):

Quasi-Elastic and Elastic (December 2017 Run)

E0=2.2 GeV

Run-Set Theta (Degree) Ep (GeV/c) Physics Targets Total Events Comments
Kin1.1 15 2.14 Elastic H3, He3, D2, H1, Empty, Dummy
Kin1.2 15 2.04 QE H3, He3, D2, H1, Empty, Dummy
Kin2.1 17 2.13 Elastic H3, He3, D2, H1, Empty, Dummy
Kin2.2 17 2.00 QE H3, He3, D2, H1, Empty, Dummy Share the same data set as the Boiling Study
Kin3.1 22 2.08 Elastic H3, He3, D2, H1, Empty
Kin3.2 22 1.88 QE H3, He3, D2, H1, Empty
Kin4.1 26 2.04 Elastic H3, He3, D2, H1, Empty
Kin4.2 26 1.78 QE H3, He3, D2, H1, Empty
Kin5.1 30 1.99 Elastic H3, He3, D2, H1, Empty
Kin5.2 30 1.67 QE H3, He3, D2, H1, Empty

2N-SRC Isospin and 3N-SRC (2018 Run)

Physics Projection