SRC Production Run

From Tritium Experiments Group
Jump to navigation Jump to search

Back to 2017 Full Run

Back to Tritium Main

  • Quasi-Elastic and Elastic (HRS-L Only, December 2017 Run):
  • 2N-Isopin and 3N-SRC (2018 Run):

Quasi-Elastic and Elastic (December 2017 Run)

  • E0=2.2 GeV
Run-Set Theta (Degree) Ep (GeV/c) Physics Targets Total Events List of Runs Comments
Kin1.1 15 2.14 Elastic He3, H3, Dummy xxxx, xxxx, xxx,xxxx,xxxx,xxxx,
Kin1.2 15 2.04 QE He3, H3, D2, H1, Dummy
Kin2.1 17 2.13 Elastic He3, H3,Empty, Dummy
Kin2.2 17 2.00 QE He3, H3, D2, H1, Empty, Dummy Share the same data set as the Boiling Study
Kin3.1 22 2.08 Elastic He3, H3,Dummy
Kin3.2 22 1.88 QE He3, H3, D2, H1, Dummy
Kin4.1 26 2.04 Elastic He3, H3, Dummy
Kin4.2 26 1.78 QE He3, H3, D2, H1, Dummy
Kin5.1 30 1.99 Elastic He3, H3, Dummy
Kin5.2 30 1.67 QE He3, H3, D2, H1 Dummy

2N-SRC Isospin and 3N-SRC (2018 Run)

Physics Projection (in proposal)