SRC Production Run

From Tritium Experiments Group
Revision as of 22:20, 14 December 2017 by Yez (talk | contribs) (→‎Elastic Run)
Jump to navigation Jump to search

Back to 2017 Full Run

Back to Tritium Main

  • Quasi-Elastic and Elastic (HRS-L Only, December 2017 Run):
  • 2N-Isopin and 3N-SRC (2018 Run):

Quasi-Elastic and Elastic (December 2017 Run, E0=2.2 GeV)

Quasi-Elastic Run

Run-Set Theta (Degree) Ep (GeV/c) Physics Targets Total Events List of Runs Comments
Kin2.1 17 2.00 QE He3, H3, D2, H1, Empty, Dummy Share the same data set as the Boiling Study
Kin3.1 22 1.88 QE He3, H3, D2, H1, Dummy
Kin4.1 26 1.78 QE He3, H3, D2, H1, Dummy
Kin5.1 30 1.67 QE He3, H3, D2, H1 Dummy
  • May Take:
Kin1.1 15 2.04 QE He3, H3, D2, H1, Dummy xxxx, xxxx, xxx,xxxx,xxxx,xxxx

Elastic Run

Run-Set Theta (Degree) Ep (GeV/c) Physics Targets Total Events List of Runs Comments
Kin1.2 15 2.14 Elastic He3, H3, Dummy xxxx, xxxx, xxx,xxxx,xxxx,xxxx,
Kin4.2 26 2.04 Elastic He3, H3, Dummy
  • May Take
Kin2.2 17 2.13 Elastic He3, H3,Dummy
Kin3.2 22 2.08 Elastic He3, H3,Dummy
Kin5.2 30 1.99 Elastic He3, H3, Dummy

2N-SRC Isospin and 3N-SRC (2018 Run)

Physics Projection (in proposal)