Target Boiling Study

From Tritium Experiments Group
Revision as of 22:30, 30 November 2017 by Yez (talk | contribs)
Jump to navigation Jump to search

Back to Installation and Commissioning

  • H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 22.5uA 2x2 cm
H3 20uA 2x2 cm
H3 12uA 2x2 cm
H3 7uA 2x2 cm
H3 3uA 2x2 cm
  • He3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
He3 22.5uA 2x2 cm
He3 20uA 2x2 mm
He3 12uA 2x2 mm
He3 7uA 2x2 cm
He3 3uA 2x2 cm


  • C12 target for a normalization check for beam-current dependent rate check.
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 22.5uA 2x2 mm
Carbon-Foil 20uA 2x2 mm
Carbon-Foil 12uA 2x2 mm
Carbon-Foil 7uA 2x2 mm
Carbon-Foil 3uA 2x2 mm