Target Boiling Study

From Tritium Experiments Group
Revision as of 17:50, 15 December 2017 by Yez (talk | contribs)
Jump to navigation Jump to search

Back to Installation and Commissioning

  • E0 = 2.2 GeV, Ep = 2.00 GeV/c, Theta = 17 Degrees, *Raster On* (2.5mmx2mm MCC = 2mmx2mm on target)
  • Empty-Cell Target
Run number Target Beam Current Comment
Empty Cell 22.5uA 100K Events after cut |VZ|<7.5cm
  • H2 Target
Run number Target Beam Current Comment
H2 22.5uA
H2 15uA
H2 10uA
H2 5uA
H2 2.5uA
  • H3 Target
Run number Target Beam Current Comment
H3 22.5uA
H3 15uA
H3 10uA
H3 5uA
H3 2.5uA
  • He3 Target
Run number Target Beam Current Comment
He3 22.5uA
He3 15uA
He3 10uA
He3 5uA
He3 2.5uA
  • D2 Target
Run number Target Beam Current Comment
D2 22.5uA
D2 15uA
D2 10uA
D2 5uA
D2 2.5uA
  • C12 Target
Run number Target Beam Current Comment
C12 22.5uA
C12 15uA
C12 10uA
C12 5uA
C12 2.5uA