Target Boiling Study

From Tritium Experiments Group
Revision as of 17:42, 21 December 2017 by Ssanties (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Installation and Commissioning

  • E0 = 2.2 GeV
  • HRS-L: Ep = 2.00 GeV/c, Theta = 17 Degrees
  • HRS-R: Ep = 1.78 GeV/c, Theta = 26 Degrees
  • Raster On* (2.5mmx2mm MCC = 2mmx2mm on target)
  • Empty-Cell Target
Run number Target Beam Current Comment
891 Empty Cell 22.5uA 100K Events after cut |VZ|<7.5cm
924 Empty Cell 5uA 100K Events after cut |VZ|<7.5cm
  • For the rest of the run, take 100K Events for each run after cutting |VZ|<7.5cm. (Will update this number with a correction factor from the Empty-Target Cell run)
  • H1 Target
Run number Target Beam Current Comment
895-894 H1 22.5uA
896 H1 15uA
897 H1 10uA
899 H1 5uA
901 H1 2.5uA
  • D2 Target
Run number Target Beam Current Comment
923 D2 22.5uA
921 D2 15uA
920 D2 10uA
918 D2 5uA
919 D2 2.5uA


  • H3 Target
Run number Target Beam Current Comment
911 H3 22.5uA
910 H3 15uA
908,909 H3 10uA
905 H3 5uA
902 H3 2.5uA
907 H3 1uA
  • He3 Target
Run number Target Beam Current Comment
912 He3 22.5uA
913 He3 15uA
914 He3 10uA
915 He3 5uA
916 He3 2.5uA
  • C12 Target
Run number Target Beam Current Comment
C12 22.5uA
C12 15uA
C12 10uA
925 C12 5uA
C12 2.5uA
  • Dummy
Run number Target Beam Current Comment
875 Dummy 24uA
876 Dummy 15uA
877 Dummy 10uA
879, 878 Dummy 5uA
881 Dummy 2.5uA