* ME providing CAD models to look at and compare w/ 2D dimensioned layout [[media:beamlinelayoutmarch26.pdf]]
 
* ME providing CAD models to look at and compare w/ 2D dimensioned layout [[media:beamlinelayoutmarch26.pdf]]
: Now on [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABNsJ15YGBFTQkkMenD_ommQ Link to AIPINJ OneDrive folder], then they're in the "20.03.26 Beamline Screen Shots".
+
:: Now on [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABNsJ15YGBFTQkkMenD_ommQ Link to AIPINJ OneDrive folder], then they're in the "20.03.26 Beamline Screen Shots".
 
:: MFX before A1 moves further upstream on spool
 
:: MFX before A1 moves further upstream on spool
 
:: A2 is now a cube, instead of a cross
 
:: A2 is now a cube, instead of a cross
 
:: harp before A2 is rotated 45 deg CW looking downstream, there is a viewer on it too
 
:: harp before A2 is rotated 45 deg CW looking downstream, there is a viewer on it too
 
* Danny working w/ MDC so their BPM shop drawings match his submitted drawing
 
* Danny working w/ MDC so their BPM shop drawings match his submitted drawing
 +
:: the BPM cans from MDC are due to ship april 13th.
 
* Joe finding status of BPM feed through delivery
 
* Joe finding status of BPM feed through delivery
 
:: Requested date is 4/25
 
:: Requested date is 4/25
 +
:: the BPM antennae are due to ship: a quantity of 7 in three weeks, the balance on may 7th.
 
* ME working on finishing solenoid fixture designs
 
* ME working on finishing solenoid fixture designs
 
* Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shield.pdf]]
 
* Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shield.pdf]]
Line 29: Line 31:
 
* Scott figure out how to control [https://vacgen.com/linear-drive-70mm-od-75mm-z-m6-tapped-stepper-encoder], set limits, positions, use encoder w/ stac5
 
* Scott figure out how to control [https://vacgen.com/linear-drive-70mm-od-75mm-z-m6-tapped-stepper-encoder], set limits, positions, use encoder w/ stac5
 
:: ordered a stac5
 
:: ordered a stac5
* Tell Meyers what color to paint solenoids
+
* Let Joe Meyers know what color to paint solenoids
:: Asked for Lime
+
:: Lime
 +
* Riad - will magnetic field of first coil reach photocathode? will it affect solenoids?
 +
::Field map: [[media:BH_Haimson_Coils.xlsx]] => Field extends to 8 cm from center of magnet.
 
* Carlos/Gabriel evaluate model for smaller gap Wien filter
 
* Carlos/Gabriel evaluate model for smaller gap Wien filter
 
* Lakshmi status of PSS coil models
 
* Lakshmi status of PSS coil models
* Dennis turn elegant model values into expected magnet currents
+
* Dennis turn elegant model values into expected magnet currents.
 +
:: Using the 2020-03-26 layout:  [[Media:magnet_currents.ods]]
 
* Alicia show simulations of beams, evaluate layout for transmission and settings needed
 
* Alicia show simulations of beams, evaluate layout for transmission and settings needed
 +
* Joe - is the distance from MFG-A to upstream steering coil sufficient?
 +
* Previous to-do list...https://wiki.jlab.org/ciswiki/index.php/March_20,_2020_-_ME/INJ/CIS

Latest revision as of 16:15, 2 April 2020

Meeting Info

We will meet Thursday @ 10am EDT via BlueJeans
Meeting URL (for video and/or audio call in): https://bluejeans.com/909497334
Phone number (for audio call in): 1-888-240-2560
Meeting ID: 909497334#

Last Week's To-Do List

Now on Link to AIPINJ OneDrive folder, then they're in the "20.03.26 Beamline Screen Shots".
MFX before A1 moves further upstream on spool
A2 is now a cube, instead of a cross
harp before A2 is rotated 45 deg CW looking downstream, there is a viewer on it too
  • Danny working w/ MDC so their BPM shop drawings match his submitted drawing
the BPM cans from MDC are due to ship april 13th.
  • Joe finding status of BPM feed through delivery
Requested date is 4/25
the BPM antennae are due to ship: a quantity of 7 in three weeks, the balance on may 7th.
  • ME working on finishing solenoid fixture designs
  • Marcy checking on top hat configuration for Y-chamber media:200326_viewer shield.pdf
  • ME can go ahead order spools for Sections 2 & 3
  • Shaun add "stay clear" zone of camera to model
Joe measured 4" dia x 6" length tube
  • Danny check with Milhous & Jlab people for dipole design
Yes, nice examples. Jay OK. Joe OK. Req submitted & signed
  • Reza talk out with Curt or Rick about power needed and controls desired
  • DP can, will new $$$ NEG's fit or not
  • Marcy get quotes on A1/A2 cubes and 6-way cross w/ R-R
  • Decide on A1 media:200326_aperture 1.pdf insert depths
  • Finalize A2 media:200326_aperture 2.pdf in layout, need to wind coils now too
  • Scott figure out how to control [1], set limits, positions, use encoder w/ stac5
ordered a stac5
  • Let Joe Meyers know what color to paint solenoids
Lime
  • Riad - will magnetic field of first coil reach photocathode? will it affect solenoids?
Field map: media:BH_Haimson_Coils.xlsx => Field extends to 8 cm from center of magnet.
  • Carlos/Gabriel evaluate model for smaller gap Wien filter
  • Lakshmi status of PSS coil models
  • Dennis turn elegant model values into expected magnet currents.
Using the 2020-03-26 layout: Media:magnet_currents.ods