Difference between revisions of "Wednesday March 5, 2014"

From Ciswikidb
Jump to navigation Jump to search
Line 9: Line 9:
 
1- New "5 MeV" Dipole update and shielding of Earth's magnetic field
 
1- New "5 MeV" Dipole update and shielding of Earth's magnetic field
 
  Magnet Drawings:
 
  Magnet Drawings:
   JL0008751_DL_COIL_SPACER.pdf
+
   JL0008751_DL_COIL_SPACER.pdf [[media:L0008751_DL_COIL_SPACER.pdf]]
   JL0008736_DL_MAGNET_CORE-BOTTOM.pdf
+
   JL0008736_DL_MAGNET_CORE-BOTTOM.pdf [[media:JL0008736_DL_MAGNET_CORE-BOTTOM.pdf]]
   JL0008100_DL_MAGNET_COIL.pdf
+
   JL0008100_DL_MAGNET_COIL.pdf [[media:JL0008100_DL_MAGNET_COIL.pdf]]
   JL0011326_DL_TERMINAL_COVER.pdf
+
   JL0011326_DL_TERMINAL_COVER.pdf [[media:L0011326_DL_TERMINAL_COVER.pdf]]
   JL0008745_DL_MAGNET_STEEL.pdf
+
   JL0008745_DL_MAGNET_STEEL.pdf [[media:L0008745_DL_MAGNET_STEEL.pdf]]
   JL0008102_DL_MAGNET_ASSEMBLY.pdf
+
   JL0008102_DL_MAGNET_ASSEMBLY.pdf [[media:JL0008102_DL_MAGNET_ASSEMBLY.pdf]]
   JL0008098_DL_MAGNET_CORE-TOP.pdf
+
   JL0008098_DL_MAGNET_CORE-TOP.pdf [[media:JL0008098_DL_MAGNET_CORE-TOP.pdf]]
  
  

Revision as of 15:14, 27 February 2014

We will meet in TL 2236 on Wednesday March 5 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

1- New "5 MeV" Dipole update and shielding of Earth's magnetic field

Magnet Drawings:
 JL0008751_DL_COIL_SPACER.pdf media:L0008751_DL_COIL_SPACER.pdf
 JL0008736_DL_MAGNET_CORE-BOTTOM.pdf media:JL0008736_DL_MAGNET_CORE-BOTTOM.pdf
 JL0008100_DL_MAGNET_COIL.pdf media:JL0008100_DL_MAGNET_COIL.pdf
 JL0011326_DL_TERMINAL_COVER.pdf media:L0011326_DL_TERMINAL_COVER.pdf
 JL0008745_DL_MAGNET_STEEL.pdf media:L0008745_DL_MAGNET_STEEL.pdf
 JL0008102_DL_MAGNET_ASSEMBLY.pdf media:JL0008102_DL_MAGNET_ASSEMBLY.pdf
 JL0008098_DL_MAGNET_CORE-TOP.pdf media:JL0008098_DL_MAGNET_CORE-TOP.pdf


2- Can we get a handle on Earth's field by measuring the beam energy simultaneously in the 2D Spectrometer? In this case we need to add another BPM and two Quads (could be weak) to this line.

3- Bubble Chamber progress at Argonne

4- Bubble Chamber Schedule at JLab

5- How would the 5D beamline look for the Bubble Chamber test in October 2014?

 * Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble
Chamber beamline, in the radiator chamber.