Difference between revisions of "CEBAF Injector Upgrade"

From Ciswikidb
Jump to navigation Jump to search
Line 25: Line 25:
 
:[[NEG coated 2.5 inch OD BPM's]]
 
:[[NEG coated 2.5 inch OD BPM's]]
 
:[[A1/A2 Aperture Steering Cubes]] - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
 
:[[A1/A2 Aperture Steering Cubes]] - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
 
::[[Vacuum Upgrades]]
 
 
:[[Injector upgrade vacuum improvements]] - Improvements in the vacuum design, use of getter and ion pumps
 
:[[Injector upgrade vacuum improvements]] - Improvements in the vacuum design, use of getter and ion pumps
  
 
==ATLIS Tasks==
 
==ATLIS Tasks==
=== AIPINJ ===
+
;AIPINJ
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 Injector Camac to Vme and camera upgrade]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 Injector Camac to Vme and camera upgrade]
Line 43: Line 41:
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
=== Non-AIPINJ ===
+
;RSRSRC
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard

Revision as of 13:31, 27 August 2020

This area is related to Injector Upgrade Meetings

Injector upgrade calendar

Run (now - May 6)
Phase 1 (May 6 - end of 2020)
Run (Jan 2021 - Sep 13 2021)
Phase 2 (Sep 13 - end of 2021)

Injector Upgrade Meetings

Link to AIPINJ OneDrive folder

AIPINJ Layouts

Injector Upgrade Documents and Links

Major Beamline Components

DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker has been designed to operate at higher momentum and with more reliable design
WF Wien Filters (200 kV upgrade) - Wien filters are upgraded with new coils (20 A) and new high voltage (+/- 18 kV) for operation at 200 keV
QW Wien quadrupoles (200 kV upgrade) - New quadrouple are designed for higher 200 keV energy, but also of improved magnetic design w/ minimized dipole component
Chopping System (200 kV upgrade)
Pre-buncher cavity (200 kV upgrade)
NEG coated 2.5 inch OD BPM's
A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps

ATLIS Tasks

AIPINJ
RSRSRC