These pages contain materials for modifying the standard CEBAF Wien filter design (originally SLAC 100kV Wien filter) for operation at 200kV.
200 keV Wien HV Controls
200 keV Wien SPIN Controls
200 keV Wien Magnet
- Feb 11, 2020 - Final coil design media:200KeVWienFIlter-32893-D-0131.pdf
- Mar 10, 2020 - Vendor has begun coil winding media:20200305_145427.jpg
200 keV Wien Magnetic Field Maps
- Media:Vertical Wien Integrals (19.9A Hyst) with SCE410.xlsx
- Media:V-Wien_FieldMap_Analysis.pptx
- Media:V-Wien_FieldMap_data.xlsx
- Media:Horizontal Wien Integrals (19.9A Hyst) with SCE410 CORRECT Ni plates.xlsx
- Media:H-Wien_FieldMap_Analysis.pptx
- Media:H-Wien_FieldMap_data.xlsx
- Media:MWF1I04.txt
- Media:MWF1I06.txt
- Media:wien_maps.png
200 keV Wien Assembly
Field maps for GPT simulations
Making Nickel End Mirror Plates (Jan 2021)
- Riad identified H-Wien magnetic Ni end clamp plates were not as good magnetically as V-Wien
- (5) Ni 200/201 plates were ordered, fabricated by the machine shop media:32893-0011 end plate marked up.pdf
- Material certifications here: media:210104_NickelCerts.pdf
- Machined end plates cleaned with solvent only (Micro-90 can react/etch Nickel)
- Jay's info for anneal Ni 200/201
- * Vendor link and local copy of file here media:nickel-200-201.pdf
- * See page 13 "heating" for annealing info Higher temperature than I expected. They don't mention vacuum furnaces but the ones in the TL should suffice if all the contaminants from brazing can be removed. If not, perhaps the inductance furnace used for cavities, which is clean; SRF might not want any nickel in it, however.
- Annealing performed by Scott Williams per vendor spec (1450F for 30min)
CEBAF Wien Filter Upgrade Iterations
- 200kV Wien filter - FINAL - This is for the two rebuilt Wien filters for CEBAF.
- 200kV Wien filter - V3 - Third iteration modeled in CST by Gabriel with improved 40 kV feedthroughs has demonstrated (2019) 20kV per plate at UITF on a test stand but test still undergoing. Intended as a testbed for 20kV switch chassis test in preparation for implementation at CEBAF.
- 200kV Wien filter - V2 - Second iteration built using 20kV feedthroughs and HV tested in UITF beamline 2018 to ~12 kV limited by large vacuum excursions
- 200kV Wien filter - V1 - First iteration to modify CEBAF Wien filter for 200kV operation, fabricated per Jay's proposal, and installed at UITF 2017