===Depo chamber : Replace schneedle, fix pucks, opportunistic jobs=== | ===Depo chamber : Replace schneedle, fix pucks, opportunistic jobs=== | ||
* Vent Depo Chamber | * Vent Depo Chamber | ||
− | : Pump out NF3, plan to leave leak valve as is | + | : Pump out NF3, plan to leave leak valve as is ->> DONE 04/30/2021 |
− | : Vent Depo chamber (isolation valve - bake line - pump) | + | : Vent Depo chamber (isolation valve - bake line - pump) ->> DONE 04/30/2021 |
: Remove and mic pucks vs. series 30 series dwg, clean, fix [[media:JL0047248 PUCK BODY REV A.pdf]] [[media:MoPuckMount.docx]] | : Remove and mic pucks vs. series 30 series dwg, clean, fix [[media:JL0047248 PUCK BODY REV A.pdf]] [[media:MoPuckMount.docx]] | ||
− | : Pucks as of March 31 2021 | + | :*[https://logbooks.jlab.org/entry/3875249 Pucks removed 04/30/2021] |
− | [https://logbooks.jlab.org/entry/3873740 | + | :*[https://logbooks.jlab.org/entry/3875347 Pucks measured 05/03/2021] |
− | + | : Pucks as of March 31 2021 [https://logbooks.jlab.org/entry/3873740 Link to UITFLOG entry] | |
− | + | ::[[Media:UITF pucks in HV and prep chambers as of March 31 2021.jpg]] | |
− | + | :HV chamber | |
− | + | ::Puck # 14 is missing its tab (ear). It has bulk GaAs last activated March 31 2021, good QE | |
− | + | :Depo chamber | |
− | + | ::Puck # 31 Bulk GaAs Used many times, not very good QE | |
+ | ::Puck # 8 Bulk GaAs used as dummy for HV conditioning | ||
+ | ::Puck # 22 SSL perhaps never activated? | ||
: Add pucks => new bulk GaAs on X pucks + special one for HV conditioning? | : Add pucks => new bulk GaAs on X pucks + special one for HV conditioning? | ||
− | : Replace K source with Alvatec Sb source = | + | : Replace K source with Alvatec Sb source |
+ | :: Mamun found Russ' Sb req : https://misportal.jlab.org/reqs/pr/viewPrPo.do?prNum=315281 | ||
: Replace w/ Nitronic schneedle (make sure fit to pucks good first), set alignment into electrode w/o or w/ puck | : Replace w/ Nitronic schneedle (make sure fit to pucks good first), set alignment into electrode w/o or w/ puck | ||
:: Make (2) SS schneedle w/o silver plating, replace depo chamber silver plated schneedle [[media:ACC2003000-0219 schneedle.pdf]] | :: Make (2) SS schneedle w/o silver plating, replace depo chamber silver plated schneedle [[media:ACC2003000-0219 schneedle.pdf]] | ||
Line 21: | Line 24: | ||
::* [https://www.hpalloy.com/Alloys/descriptions/NITRONIC60.aspx?kw=%2Bnitronic%20%2B60&cpn=48402520&utm_term=%2Bnitronic%20%2B60&utm_campaign=NITRONIC&utm_source=adwords&utm_medium=ppc&hsa_net=adwords&hsa_tgt=kwd-41394160017&hsa_ad=393453120372&hsa_acc=6124394374&hsa_grp=1610180530&hsa_mt=b&hsa_cam=48402520&hsa_kw=%2Bnitronic%20%2B60&hsa_ver=3&hsa_src=g&gclid=EAIaIQobChMIzJv0vOnp7wIVypyzCh0bPAmCEAAYASAAEgLYn_D_BwE Nitronic 60 data sheet] (Nitronic trademark AK Steel) | ::* [https://www.hpalloy.com/Alloys/descriptions/NITRONIC60.aspx?kw=%2Bnitronic%20%2B60&cpn=48402520&utm_term=%2Bnitronic%20%2B60&utm_campaign=NITRONIC&utm_source=adwords&utm_medium=ppc&hsa_net=adwords&hsa_tgt=kwd-41394160017&hsa_ad=393453120372&hsa_acc=6124394374&hsa_grp=1610180530&hsa_mt=b&hsa_cam=48402520&hsa_kw=%2Bnitronic%20%2B60&hsa_ver=3&hsa_src=g&gclid=EAIaIQobChMIzJv0vOnp7wIVypyzCh0bPAmCEAAYASAAEgLYn_D_BwE Nitronic 60 data sheet] (Nitronic trademark AK Steel) | ||
::* won't use this ... although probably not a problem, can be mildly magnetic [https://www.associatedsteel.com/stainless-steels/17-4-stainless-steel-pump-shaft-stainless-custom-450-stainless-tgp-mir50/ Mir50] (Mir50 trademark ASC Steel) | ::* won't use this ... although probably not a problem, can be mildly magnetic [https://www.associatedsteel.com/stainless-steels/17-4-stainless-steel-pump-shaft-stainless-custom-450-stainless-tgp-mir50/ Mir50] (Mir50 trademark ASC Steel) | ||
+ | ::*[https://logbooks.jlab.org/entry/3875344 316L SS and Nitronic schneedles made, cleaned and tested in pucks #8, #22, and #31] | ||
: Return 10" flange | : Return 10" flange | ||
: Align floppy mask to puck on heater, fix mask | : Align floppy mask to puck on heater, fix mask | ||
Line 29: | Line 33: | ||
:*"new" niobium electrode here : https://wiki.jlab.org/ciswiki/index.php/CIS-ASY-R28-1 | :*"new" niobium electrode here : https://wiki.jlab.org/ciswiki/index.php/CIS-ASY-R28-1 | ||
:: LgGnNb leak check => done 4/8, Carlos leak tested complete assembly in 1137 | :: LgGnNb leak check => done 4/8, Carlos leak tested complete assembly in 1137 | ||
− | :: LgGnNb fiducialize => done, Chris | + | :: LgGnNb fiducialize => done, Chris provide Carlos this info to compare assembly to assembly [[Media:R28_3_S&A_Inspection_Apr-14-2021.xlsx]] |
* Alignment Jobs in Cave | * Alignment Jobs in Cave | ||
: Walk job with Carlos & Chris => done 4/7 | : Walk job with Carlos & Chris => done 4/7 | ||
− | : S&A perform an as-found of the Gun through Y chamber => [[media: | + | : S&A perform an as-found of the Gun through Y chamber => [[media:UITF Y Chamber Line April 22 2021.xlsx]] |
+ | :[https://logbooks.jlab.org/entry/3874561 Link to UITFLOG entry on SA& results and comments] | ||
: Matt's "Have-Want" summary pics [[media:210414_HaveWant.pptx]] | : Matt's "Have-Want" summary pics [[media:210414_HaveWant.pptx]] | ||
: Decide if we want to run beam before venting => don't think so, agree at 4/15 UITF meeting | : Decide if we want to run beam before venting => don't think so, agree at 4/15 UITF meeting |
Revision as of 14:11, 3 May 2021
Depo chamber : Replace schneedle, fix pucks, opportunistic jobs
- Vent Depo Chamber
- Pump out NF3, plan to leave leak valve as is ->> DONE 04/30/2021
- Vent Depo chamber (isolation valve - bake line - pump) ->> DONE 04/30/2021
- Remove and mic pucks vs. series 30 series dwg, clean, fix media:JL0047248 PUCK BODY REV A.pdf media:MoPuckMount.docx
- Pucks as of March 31 2021 Link to UITFLOG entry
- HV chamber
- Puck # 14 is missing its tab (ear). It has bulk GaAs last activated March 31 2021, good QE
- Depo chamber
- Puck # 31 Bulk GaAs Used many times, not very good QE
- Puck # 8 Bulk GaAs used as dummy for HV conditioning
- Puck # 22 SSL perhaps never activated?
- Add pucks => new bulk GaAs on X pucks + special one for HV conditioning?
- Replace K source with Alvatec Sb source
- Mamun found Russ' Sb req : https://misportal.jlab.org/reqs/pr/viewPrPo.do?prNum=315281
- Replace w/ Nitronic schneedle (make sure fit to pucks good first), set alignment into electrode w/o or w/ puck
- Make (2) SS schneedle w/o silver plating, replace depo chamber silver plated schneedle media:ACC2003000-0219 schneedle.pdf
- 4/6 - Shop is fabricating two, trying to have one ready by 4/18
- one from 316 or 316L SS and one from Nitronic 60 https://mis.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=330210&code=1
- Nitronic 60 data sheet (Nitronic trademark AK Steel)
- won't use this ... although probably not a problem, can be mildly magnetic Mir50 (Mir50 trademark ASC Steel)
- 316L SS and Nitronic schneedles made, cleaned and tested in pucks #8, #22, and #31
- Return 10" flange
- Align floppy mask to puck on heater, fix mask
HV chamber : Replace cathode electrode
- Electrode Prep Work
- "old" existing electrode here : https://wiki.jlab.org/ciswiki/index.php/CIS-ASY-R28-3
- "new" niobium electrode here : https://wiki.jlab.org/ciswiki/index.php/CIS-ASY-R28-1
- LgGnNb leak check => done 4/8, Carlos leak tested complete assembly in 1137
- LgGnNb fiducialize => done, Chris provide Carlos this info to compare assembly to assembly Media:R28_3_S&A_Inspection_Apr-14-2021.xlsx
- Alignment Jobs in Cave
- Walk job with Carlos & Chris => done 4/7
- S&A perform an as-found of the Gun through Y chamber => media:UITF Y Chamber Line April 22 2021.xlsx
- Link to UITFLOG entry on SA& results and comments
- Matt's "Have-Want" summary pics media:210414_HaveWant.pptx
- Decide if we want to run beam before venting => don't think so, agree at 4/15 UITF meeting
- Vent HV Chamber to replace cathode (isolation valve - bake pump - turbo)
- Start depo jobs first to be ready for manipulator alignment
- S&A will fiducialize upstream anode face in UITF
- S&A will be able to help us align new schneedle where cathode will go
- S&A will be able to align cathode to anode
- S&A will be able to align cathode/anode combo on whatever line we want (thinking Y ports)
- CIS follows up for puck in/out tests, and laser alignment
Other jobs
- Improve stalk heater driver motion => done, https://logbooks.jlab.org/entry/3871902