Difference between revisions of "Bubble Demo ME May 9, 2014"
Jump to navigation
Jump to search
Line 26: | Line 26: | ||
: (Riad/Brad/Shaun) Mounting in tunnel | : (Riad/Brad/Shaun) Mounting in tunnel | ||
: (Riad/Brad/Shaun) Chamber alignment capability | : (Riad/Brad/Shaun) Chamber alignment capability | ||
+ | :: [[media:140508_MountBubble.docx]] [[media:140508_MountBubble.pdf]] | ||
== FINAL installation == | == FINAL installation == | ||
: Identify suitable dump dipole and its dimensions | : Identify suitable dump dipole and its dimensions |
Revision as of 07:57, 8 May 2014
We will meet Friday May 9 @ 9am in TL-2236.
SUMMER Installation
DL Items
- (Shaun/Joe) Finalize/sign drawings => Done?
- (Tim) Identify vendor for DL? => PR#343083 to get quotes from Alpha Magnetics, New England Technicoil, Stangnes Industries
- (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate => ???
Beamline layout
- (Shaun) Send Joe copy of layout => Done
- (Joe) Help categorize component inventory
- re-use from tunnel, on shelf, buy part, design/fab part
- (Shaun) Bellows arrangement
- (Shaun) Modify support of "green" girder
- (Shaun) Plan/schedule for drawings and fabrication
- (Riad) Aluminum photon dump dimensions
Beamline components
- (Joe) Are MBH corrector strengths sufficient?
- (Joe M.) Is radiator cooling flange sufficient?
Bubble Chamber Alignment
- (Riad/Brad/Shaun) Mounting in tunnel
- (Riad/Brad/Shaun) Chamber alignment capability
FINAL installation
- Identify suitable dump dipole and its dimensions