Difference between revisions of "2021-07-21"
Jump to navigation
Jump to search
(Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...") |
|||
(11 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
To connect to the meeting, please do the following: | To connect to the meeting, please do the following: | ||
Time: Wednesday at 9:00 AM EST. | Time: Wednesday at 9:00 AM EST. | ||
− | # To join via a Web Browser, go to the page [https://bluejeans.com/ | + | # To join via a Web Browser, go to the page [https://bluejeans.com/984025598] https://bluejeans.com/984025598. |
− | # To join via Polycom room system go to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: | + | # To join via Polycom room system go to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 984025598. |
− | # To join via phone, use one of the following numbers and the Conference ID: | + | # To join via phone, use one of the following numbers and the Conference ID: 984025598. |
#* Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada | #* Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada | ||
Line 13: | Line 13: | ||
==== <u>Schedule</u> ==== | ==== <u>Schedule</u> ==== | ||
Long Term Schedule: [[Media:WW-Install_6.22.21.pdf|Gantt]] ([[Media:WW-ToDo_6.22.21.pdf|Outstanding tasks]]) | Long Term Schedule: [[Media:WW-Install_6.22.21.pdf|Gantt]] ([[Media:WW-ToDo_6.22.21.pdf|Outstanding tasks]]) | ||
− | |||
− | |||
# 7/26/21 Start Hot Check-out | # 7/26/21 Start Hot Check-out | ||
− | + | ||
− | + | ||
==== <u>New items for discussion:</u> ==== | ==== <u>New items for discussion:</u> ==== | ||
<u>Short term schedule update:</u><br> | <u>Short term schedule update:</u><br> | ||
<u>This week:</u> | <u>This week:</u> | ||
− | + | ||
− | + | Reports by Group: | |
− | + | CIS/EGG: | |
− | + | # [https://logbooks.jlab.org/entry/3884328 Gun/Depo chamber bake started] and [https://logbooks.jlab.org/entry/3885376 completed] | |
− | + | # [https://logbooks.jlab.org/entry/3885738 Gun HVPS tank topped to 60 psig SF6]; [https://logbooks.jlab.org/entry/3885748 NF3 charged] as well | |
− | + | # [https://logbooks.jlab.org/entry/3885740 R30 resistor installed for gun HV processing] | |
− | + | # [https://logbooks.jlab.org/entry/3885787 Gun anode picoammeter connected] | |
− | + | # [https://logbooks.jlab.org/entry/3885764 Decarad probes placed] for gun | |
− | + | # [https://logbooks.jlab.org/entry/3886422 MDSK201 interlock] in gun HVPS bypassed for HV commissioning (See [https://logbooks.jlab.org/entry/3886643 ABIL5170]) | |
+ | # [https://logbooks.jlab.org/entry/3886430 Steel puck in place] | ||
+ | # [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1663 Gun HV Processing] under way (UITFList 1663); up to [https://logbooks.jlab.org/entry/3886789 182kV] so far | ||
+ | # [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild schedule] | ||
+ | DC Power: | ||
+ | # [https://logbooks.jlab.org/entry/3883526 Corrector installation & cable reroute mostly complete], turned over to DC power | ||
+ | # Correctors inventoried following some naming confusion (MHB vs MBH); MBH = Magnet Big Haimson (2.75" bore); MHB family will be renamed MLH = Magnet Little Haimson (1.5" bore) | ||
+ | # Chris Gould making nomenclature changes / Gary Croke & Michele Joyce making controls changes / Eric Forman to update Quick Reference Drawing / Shaun to take care of song sheets | ||
+ | # Changes made in UED workspace for names and field maps; ready to merge soon. (Thanks Gary!) | ||
+ | # Raster installation - [https://logbooks.jlab.org/entry/3885536 completed]; per Bill Gunning. (Thanks!) Also, thank you for software and channel access integration by Weiwei & Brian and John for staying on top of things! | ||
+ | # [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1672 Solenoid PS] being installed | ||
+ | Instrumentation and Controls: | ||
+ | # [https://logbooks.jlab.org/entry/3884311 BPMs connections good - save iocipmm904 removal - iocipmm901 installed in its place] | ||
+ | # BPM IOCs updated with new configuration. (Thanks Kyle!) | ||
+ | # Install target mechanism (Completed), [https://logbooks.jlab.org/entry/3884440 motor controls tested] - Survey required | ||
+ | # [https://logbooks.jlab.org/entry/3885781 Insertables APP undated] with new installation (Thanks Scott!); iocitf2 rebooted. | ||
+ | # BCM project software integration under way between Musson/Seaton and Sue Witherspoon | ||
+ | # Chris Norris to hook up viewers next week. | ||
+ | # Brian Freeman available for adViewer work for video camera for ITVM604A; some focusing still required. | ||
+ | RF: | ||
+ | # [https://logbooks.jlab.org/entry/3885411 6GHz] > 1.5GHz Down-converter installed for bunch length system | ||
+ | Vacuum: | ||
+ | # [https://logbooks.jlab.org/entry/3884298 Spectrometer pumps on EPICs], [https://logbooks.jlab.org/entry/3884303 Turbo disconnected] | ||
+ | SSG: | ||
+ | # BLM locations being set 7/21 following this meeting | ||
+ | # FSD inputs for magnet and BCM being prepared | ||
+ | ME / Installation: | ||
+ | # [https://logbooks.jlab.org/entry/3885222 Nomenclature for elements disseminated and labelled] | ||
+ | # Build 80/20 support structure for Pb (Completed) | ||
+ | # Ready to install Al base plates for FC3 region rework as well as solenoid stand. [https://logbooks.jlab.org/entry/3883262 80/20 reworked for support] | ||
+ | # Pb stacked; RCG required modification due to permanent shielding req delay. | ||
+ | # New designs for [[media:FC3-SHIELDING_20JUL21v1.pdf|FC3]] and [[media:FC4-SHIELDING_20JUL21v1.pdf|FC4]] with a great many thanks to Shaun for the design work and John/Xi for Pb arrangement and table construction! | ||
+ | # [[media:JL0029599-2000UITF_MeV_BEAMLINE07-JUN-21.pdf|Songsheet]] being updated by Shaun; be sure to let him know when changes are made! | ||
+ | # Status of permanent shielding purchase? | ||
+ | Experiment: | ||
+ | # [[media:ESAD_UITF-irradiation beamline_071421.docx|ESAD]], [[media:COO-UITF-irradiation-exp_070921.docx|COO]], and draft response to ERR under way by Gigi. ESAD/COO signed and turned over to Accelerator DSO. | ||
+ | Other: | ||
+ | * EES work happening in earnest | ||
* [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]] | * [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
<u>Still to do:</u> | <u>Still to do:</u> |
Latest revision as of 09:22, 21 July 2021
Meeting Information
Connecting
To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/984025598.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 984025598.
- To join via phone, use one of the following numbers and the Conference ID: 984025598.
- Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Agenda
Schedule
Long Term Schedule: Gantt (Outstanding tasks)
- 7/26/21 Start Hot Check-out
New items for discussion:
Short term schedule update:
This week:
Reports by Group: CIS/EGG:
- Gun/Depo chamber bake started and completed
- Gun HVPS tank topped to 60 psig SF6; NF3 charged as well
- R30 resistor installed for gun HV processing
- Gun anode picoammeter connected
- Decarad probes placed for gun
- MDSK201 interlock in gun HVPS bypassed for HV commissioning (See ABIL5170)
- Steel puck in place
- Gun HV Processing under way (UITFList 1663); up to 182kV so far
- Gun rebuild schedule
DC Power:
- Corrector installation & cable reroute mostly complete, turned over to DC power
- Correctors inventoried following some naming confusion (MHB vs MBH); MBH = Magnet Big Haimson (2.75" bore); MHB family will be renamed MLH = Magnet Little Haimson (1.5" bore)
- Chris Gould making nomenclature changes / Gary Croke & Michele Joyce making controls changes / Eric Forman to update Quick Reference Drawing / Shaun to take care of song sheets
- Changes made in UED workspace for names and field maps; ready to merge soon. (Thanks Gary!)
- Raster installation - completed; per Bill Gunning. (Thanks!) Also, thank you for software and channel access integration by Weiwei & Brian and John for staying on top of things!
- Solenoid PS being installed
Instrumentation and Controls:
- BPMs connections good - save iocipmm904 removal - iocipmm901 installed in its place
- BPM IOCs updated with new configuration. (Thanks Kyle!)
- Install target mechanism (Completed), motor controls tested - Survey required
- Insertables APP undated with new installation (Thanks Scott!); iocitf2 rebooted.
- BCM project software integration under way between Musson/Seaton and Sue Witherspoon
- Chris Norris to hook up viewers next week.
- Brian Freeman available for adViewer work for video camera for ITVM604A; some focusing still required.
RF:
- 6GHz > 1.5GHz Down-converter installed for bunch length system
Vacuum:
SSG:
- BLM locations being set 7/21 following this meeting
- FSD inputs for magnet and BCM being prepared
ME / Installation:
- Nomenclature for elements disseminated and labelled
- Build 80/20 support structure for Pb (Completed)
- Ready to install Al base plates for FC3 region rework as well as solenoid stand. 80/20 reworked for support
- Pb stacked; RCG required modification due to permanent shielding req delay.
- New designs for FC3 and FC4 with a great many thanks to Shaun for the design work and John/Xi for Pb arrangement and table construction!
- Songsheet being updated by Shaun; be sure to let him know when changes are made!
- Status of permanent shielding purchase?
Experiment:
- ESAD, COO, and draft response to ERR under way by Gigi. ESAD/COO signed and turned over to Accelerator DSO.
Other:
- EES work happening in earnest
- List of Engineering Jobs remaining
Still to do:
- Add Mu metal over bellows on wastewater line.
Next Week:
- Mount bottle rack in Labyrinth (Staged); remove gas bottles to rack.
- Unistrut mounting for cables - Neal will do when available
- Engineering work on beam line starting
2 weeks:
- Pull Heliax from Spectrum analyzer/Control room >> Buncher
- 4th terminal system in Control room under assembly/rebuild
- Items from To-do list...
Engineering Other business
Reports on Open Action Items:
Action Items:
- Formal run plan (McCaughan) Strawman