Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
Line 4: Line 4:
 
* DILO SF6 Transfer and recovery CART #2 - NEW (2019) Cart specs: [[File:B143R11 Data Sheet.pdf]]
 
* DILO SF6 Transfer and recovery CART #2 - NEW (2019) Cart specs: [[File:B143R11 Data Sheet.pdf]]
  
;OSPs, TOSPs and LOSPs for CEBAF
+
=== CEBAF Specific OSPs, TOSPs and LOSPs ===
  
 
These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
 
These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
 
 
* CEBAF Injector Laser Cleanroom (ACC-18-76974-LOSP), valid through 5/26/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=76974
 
* CEBAF Injector Laser Cleanroom (ACC-18-76974-LOSP), valid through 5/26/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=76974
 
 
* CEBAF Injector Laser System (ACC-19-94369-LOSP), valid through 10/31/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94369
 
* CEBAF Injector Laser System (ACC-19-94369-LOSP), valid through 10/31/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94369
 
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
  
Line 18: Line 15:
 
** [[Media:operational_safety_procedure_form_108912.pdf]]]
 
** [[Media:operational_safety_procedure_form_108912.pdf]]]
  
;Official documents managed via document-control for CEBAF
+
=== LERF Specific OSPs, TOSPs and LOSPs ===
 +
 
 +
* LERF Gun High Voltage Conditioning OSP, valid through 11/10/2021 [[Media:LERF gun OSP HV conditioning_80619_signed-off.pdf]]
 +
* LERF Gun photocathode re-cesiation (QE replenishing) DRAFT procedure [[Media:LERF Gun photocathode re-cesiation OSP.docx]]
 +
 
 +
=== Official documents managed via document-control for CEBAF ===
  
 
* CEBAF accelerator MEDCON 5 loading limits (IH1000-04g), circulated S. Hoey 9/29/20: [[media:loading limits_CEBAF ih1000004g_v4.docx]]
 
* CEBAF accelerator MEDCON 5 loading limits (IH1000-04g), circulated S. Hoey 9/29/20: [[media:loading limits_CEBAF ih1000004g_v4.docx]]
 
 
* IH Exposure Assessment: Injector Tunnel, Sulfur hexafluoride (SF6) (IH Project # 18OT137) Prepared by: Jennifer Williams, CIH [[media:18OT137.pdf]]
 
* IH Exposure Assessment: Injector Tunnel, Sulfur hexafluoride (SF6) (IH Project # 18OT137) Prepared by: Jennifer Williams, CIH [[media:18OT137.pdf]]
 
 
* CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
 
* CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
 
 
* CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
 
* CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
  
;Other documents not managed via document-control
+
=== Other documents NOT managed via document-control ===
  
 
* SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory
 
* SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory
 
 
* Task Hazard Analysis for NEG sputter coating [[media:THA_NEGSputtering.docx]]
 
* Task Hazard Analysis for NEG sputter coating [[media:THA_NEGSputtering.docx]]
 
 
* NFPA posting for chambers containing NEG materials from Jennifer Williams [[media:NEG component_ nfpa.docx]]
 
* NFPA posting for chambers containing NEG materials from Jennifer Williams [[media:NEG component_ nfpa.docx]]
 
;OSPs, TOSPs and LOSPs for LERF
 
 
* LERF Gun High Voltage Conditioning OSP, valid through 11/10/2021 [[Media:LERF gun OSP HV conditioning_80619_signed-off.pdf]]
 
 
* LERF Gun photocathode re-cesiation (QE replenishing) DRAFT procedure [[Media:LERF Gun photocathode re-cesiation OSP.docx]]
 

Revision as of 10:55, 20 August 2021

Pressure Systems

CEBAF Specific OSPs, TOSPs and LOSPs

These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

LERF Specific OSPs, TOSPs and LOSPs

Official documents managed via document-control for CEBAF

Other documents NOT managed via document-control