Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
Line 38: Line 38:
 
* LERF Gun photocathode re-cesiation (QE replenishing) DRAFT procedure [[Media:LERF Gun photocathode re-cesiation OSP.docx]]
 
* LERF Gun photocathode re-cesiation (QE replenishing) DRAFT procedure [[Media:LERF Gun photocathode re-cesiation OSP.docx]]
 
* LERF Description of HVPS SF6 vessel and gas flow [[Media:LERF-FEL SF6 transfer system overview documented September 2021.pptx]]
 
* LERF Description of HVPS SF6 vessel and gas flow [[Media:LERF-FEL SF6 transfer system overview documented September 2021.pptx]]
* Description of HVPS SF6 vessel and gas flow [[media:SF6 GTS Automatic Gas Transfer System by Kevin Jordan 2007.pptx]]
+
* GTS Description of HVPS SF6 vessel and gas flow [[Media:GTS-SF6 Automatic Gas Transfer System by Kevin Jordan 2007 uopdated by Carlos 2021.pptx]]
  
 
=== Official documents managed via document-control for CEBAF ===
 
=== Official documents managed via document-control for CEBAF ===

Revision as of 06:58, 14 September 2021

SF6 Pressure Vessel Systems

  • CEBAF SF6 HVPS pressure vessel - ASME 100 psi
https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
  • UITF SF6 HVPS Pressure vessel - ASME 100 psi
(no tank drawings): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-25492
(complete, w/ tank drawings): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867
  • GTS SF6 HVPS Pressure vessel - ASME 15 psi
(original): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-2455
(copy of 2455): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-2729
  • DILO SF6 Transfer and Recovery Cart (2019 unit)
(original) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49572
Alteration #1 - SF6 10 psi R28 resistor tank: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49570
Alteration #2 - 500 kV SF6 10 psi HV chamber: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49571
  • DILO SF6 Transfer and Recovery Cart (2013 unit)
(original): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-19051
(copy of 19051 but with two alterations): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-22091
Alteration #1 - SF6 10 psi R28 resistor tank: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49570
Alteration #2 - 500 kV SF6 10 psi HV chamber: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49571

CEBAF Specific OSPs, TOSPs and LOSPs

These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

LERF Specific

Official documents managed via document-control for CEBAF

Other documents NOT managed via document-control