===Installation===
+
===DAQ ===
* Cleaning area has begun, lasts another week or so... then installation jobs could start
+
* DAQ install at UITF [[media:220817_DAQ_PREP.pptx]]
  
===Layout===
+
===Beamline===
 
* Layout for RadCon [[media:Compton Layout for Radcon Shielding 8-10-22-3.pptx]]
 
* Layout for RadCon [[media:Compton Layout for Radcon Shielding 8-10-22-3.pptx]]
 
* Spool flanges [[media:Flanges and Reducer for Compton and RF Kicker-jmg.xlsx]]
 
* Spool flanges [[media:Flanges and Reducer for Compton and RF Kicker-jmg.xlsx]]
Line 14: Line 14:
  
 
===Magnet===
 
===Magnet===
* Kepco PS - '''ship 8/31 2 day air''' => https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412686
+
* Kepco PS - '''ship 8/31 2 day air''' => [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412686 PR]
* Magnet [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412389 EMC PR#1] [[media:220810_Magnet.jpg|coil thumb]]
+
* Magnet [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412389 EMC PR#1][https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=414754 PR#2] [[media:220810_Magnet.jpg|coil thumb]]
  
 
===Detector===
 
===Detector===
 +
* Bases - '''due 9/15 - comes with Thi in September'''
 
* Collimator - (2) on-hand [[media:JL0015777_Cu_collimator.pdf]] [[media:IMG_20220804_082153706.jpg|thumb]]
 
* Collimator - (2) on-hand [[media:JL0015777_Cu_collimator.pdf]] [[media:IMG_20220804_082153706.jpg|thumb]]
 
* Absorbers - (6) on-hand [[media:Absorber - 240 D 001 14_V4.pdf]] [[media:IMG_20220804_082037794.jpg|thumb]]
 
* Absorbers - (6) on-hand [[media:Absorber - 240 D 001 14_V4.pdf]] [[media:IMG_20220804_082037794.jpg|thumb]]
Line 23: Line 24:
 
* BGO - (2) on-hand [[media:IMG_20220804_084436318.jpg|thumb]] [[media:IMG_20220811_154533240.jpg|thumb]] [[media:IMG_20220811_154547652.jpg|thumb]] [[media:IMG_20220811_154606586.jpg|thumb]] [[media:IMG_20220811_154619455.jpg|thumb]]
 
* BGO - (2) on-hand [[media:IMG_20220804_084436318.jpg|thumb]] [[media:IMG_20220811_154533240.jpg|thumb]] [[media:IMG_20220811_154547652.jpg|thumb]] [[media:IMG_20220811_154606586.jpg|thumb]] [[media:IMG_20220811_154619455.jpg|thumb]]
 
* PMT and mu shields - (4) on-hand [[media:IMG_20220804_081738760.jpg|thumb]]
 
* PMT and mu shields - (4) on-hand [[media:IMG_20220804_081738760.jpg|thumb]]
* Bases - '''due 9/15 - comes with Thi in September'''
 
 
===DAQ ===
 
* DAQ install at UITF [[media:220817_DAQ_PREP.pptx]]
 
  
 
===Geant4 Model===
 
===Geant4 Model===
 
*
 
*
 +
 +
===Action Items===
 +
* Gary - extend spool and support two locations, relocate table further downstream, layout modifications for lead wall with hole, check stand status at mech. shop
 +
* Sandesh/Probir - follow-up with EMC re-making coil, tally list of jobs once magnet on-site
 +
* Joe - coordinate cable pulls with Nick and Nate, 20A/120VAC circuit in mech. room with FML, order spool flanges
 +
* Chris - complete rack assembly for UITF, order triax connectors
 +
* Bryan - work with Gary for soft ioc and Brad to activate network port
 +
* Greg - compute integrated asymmetry, simulate 5 configurations, use slurm to run jobs on farm
 +
* Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
  
 
===Documentation===
 
===Documentation===
 
* NIM - Elsevier Article (elsarticle) template => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
 
* NIM - Elsevier Article (elsarticle) template => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
 
* Manual - Sharepoint
 
* Manual - Sharepoint

Latest revision as of 18:28, 18 August 2022

Thursday's @ 9am EDT by Zoom

DAQ

Beamline

Magnet

Detector

Geant4 Model

Action Items

  • Gary - extend spool and support two locations, relocate table further downstream, layout modifications for lead wall with hole, check stand status at mech. shop
  • Sandesh/Probir - follow-up with EMC re-making coil, tally list of jobs once magnet on-site
  • Joe - coordinate cable pulls with Nick and Nate, 20A/120VAC circuit in mech. room with FML, order spool flanges
  • Chris - complete rack assembly for UITF, order triax connectors
  • Bryan - work with Gary for soft ioc and Brad to activate network port
  • Greg - compute integrated asymmetry, simulate 5 configurations, use slurm to run jobs on farm
  • Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies

Documentation