* Nick's to-do's | * Nick's to-do's | ||
− | ** One KEPCO installed UITF, another being | + | ** One KEPCO installed UITF, another being installed at MMF for checkout |
− | ** | + | ** Install/cable dummy load next week |
* ME to-do's | * ME to-do's | ||
− | ** extend spool and support two locations => | + | ** extend spool and support two locations => https://mis.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331199&code=1 |
** layout modifications for lead wall with hole => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331187&code=11 | ** layout modifications for lead wall with hole => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331187&code=11 | ||
− | ** stand => Chris points Thu/Fri | + | ** stand => Chris G. points Thu/Fri, then Ricky/Bern |
** lead bricks => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331188&code=11 | ** lead bricks => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331188&code=11 | ||
+ | ** top of stand w/ rails/alignment ?? | ||
* Vac to-do's | * Vac to-do's | ||
− | ** | + | ** Move pump cart, vent line |
− | ** | + | ** Remove/stow wastewater Ti window + fast valve gauge |
− | ** | + | ** Add/support spool - reducer - ceramic - dump |
+ | ** Pump down | ||
* DAQ to-do's | * DAQ to-do's | ||
Line 33: | Line 35: | ||
** DAQ in mech room, ready for the network.... | ** DAQ in mech room, ready for the network.... | ||
** Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies | ** Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies | ||
+ | |||
+ | * Detector hut to-do's | ||
+ | ** Assemble BGO/PMT into detector chassis | ||
+ | ** install/instrument collimator + magnet + detector, then rough alignment for check out | ||
+ | ** Prepare for commissioning (collimator, x-ray card, camera), but not magnet nor detector box | ||
* Greg's to-do's | * Greg's to-do's |
Revision as of 08:37, 31 August 2022
- Thursday's @ 9am EDT by Zoom
- Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09
- Zoom ID: 160 190 6056 and Passcode: 992019
New UITFList entries
- General COMTRA installation => https://tasklists.jlab.org/uitflist/tasks/107371
- DC power magnet install => https://tasklists.jlab.org/uitflist/tasks/107370
Last Week's Action Items
- Magnet to-do's
- One complete magnet on-site
- QA's beginning at MMF
- Nick's to-do's
- One KEPCO installed UITF, another being installed at MMF for checkout
- Install/cable dummy load next week
- ME to-do's
- extend spool and support two locations => https://mis.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331199&code=1
- layout modifications for lead wall with hole => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331187&code=11
- stand => Chris G. points Thu/Fri, then Ricky/Bern
- lead bricks => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331188&code=11
- top of stand w/ rails/alignment ??
- Vac to-do's
- Move pump cart, vent line
- Remove/stow wastewater Ti window + fast valve gauge
- Add/support spool - reducer - ceramic - dump
- Pump down
- DAQ to-do's
- cables pulled
- heliax connectors done
- PMT connectors ...?
- DAQ in mech room, ready for the network....
- Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
- Detector hut to-do's
- Assemble BGO/PMT into detector chassis
- install/instrument collimator + magnet + detector, then rough alignment for check out
- Prepare for commissioning (collimator, x-ray card, camera), but not magnet nor detector box
- Greg's to-do's
- compute integrated asymmetry
- use slurm to run jobs on farm
- simulate 5 configurations
DAQ
- DAQ install at UITF media:220817_DAQ_PREP.pptx
Beamline
- Layout for RadCon media:Compton Layout for Radcon Shielding 8-10-22-3.pptx
- Spool flanges media:Flanges and Reducer for Compton and RF Kicker-jmg.xlsx
- Radiator - (1) on-hand, (1) need for BNL thumb
- Stands PR Shop Job
- Lead for UITF - (11) 2 X 4 X 4, (2) 2 X 4 X 6, (99) 2 X 4 X 8 thumb
Magnet
- Kepco PS - ship 8/31 2 day air => PR
- Magnet EMC PR#1PR#2 coil thumb
Detector
- Bases - due 9/15 - comes with Thi in September
- Collimator - (2) on-hand media:JL0015777_Cu_collimator.pdf thumb
- Absorbers - (6) on-hand media:Absorber - 240 D 001 14_V4.pdf thumb
- Boxes - (2) on hand thumb
- BGO - (2) on-hand thumb thumb thumb thumb thumb
- PMT and mu shields - (4) on-hand thumb
Geant4 Model
Action Items
Documentation
- NIM - Elsevier Article (elsarticle) template => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
- Manual - Sharepoint