Difference between revisions of "Meeting 9/1/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
(Created page with ";Thursday's @ 9am EDT by Zoom * Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09 * Zoom ID: 160 190 6056 and Passcode: 992...")
 
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
 
* General COMTRA installation => https://tasklists.jlab.org/uitflist/tasks/107371
 
* General COMTRA installation => https://tasklists.jlab.org/uitflist/tasks/107371
 
* DC power magnet install => https://tasklists.jlab.org/uitflist/tasks/107370
 
* DC power magnet install => https://tasklists.jlab.org/uitflist/tasks/107370
 +
* COMTRA run time
 +
** UITFlist => https://tasklists.jlab.org/uitflist/tasks/107600
 +
  
 
=== Last Week's Action Items ===
 
=== Last Week's Action Items ===
Line 13: Line 16:
  
 
* Nick's to-do's
 
* Nick's to-do's
** One KEPCO installed UITF, another being delivered to UITF
+
** One KEPCO installed UITF, another being installed at MMF for checkout
** Provide working load next week
+
** Install/cable dummy load next week
  
 
* ME to-do's
 
* ME to-do's
** extend spool and support two locations => submitting to shop...
+
** extend spool and support two locations => https://mis.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331199&code=1
 
** layout modifications for lead wall with hole => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331187&code=11
 
** layout modifications for lead wall with hole => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331187&code=11
** stand => Chris points Thu/Fri, Neil after next Tue, then final alignment
+
** stand => Chris G. points Thu/Fri, then Ricky/Bern
 
** lead bricks => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331188&code=11
 
** lead bricks => https://misportal.jlab.org/mis/apps/job_request/mshop/view_request.cfm?request_id=331188&code=11
 +
** top of stand w/ rails/alignment ??
  
 
* Vac to-do's
 
* Vac to-do's
** 6" reducers ordered 1-2 weeks
+
** Move pump cart, vent line
** Flanges for dump spool on-hand
+
** Remove/stow wastewater Ti window + fast valve gauge
** Other kicker flanges (back)ordered 1-2 weeks lead time
+
** Add/support spool - reducer - ceramic - dump
 +
** Pump down
  
 
* DAQ to-do's
 
* DAQ to-do's
Line 33: Line 38:
 
** DAQ in mech room, ready for the network....
 
** DAQ in mech room, ready for the network....
 
** Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
 
** Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
 +
 +
* Detector hut to-do's
 +
** Assemble BGO/PMT into detector chassis
 +
** install/instrument collimator + magnet + detector, then rough alignment for check out
 +
** Prepare for commissioning (collimator, x-ray card, camera), but not magnet nor detector box
  
 
* Greg's to-do's
 
* Greg's to-do's

Latest revision as of 12:50, 3 October 2022

Thursday's @ 9am EDT by Zoom

New UITFList entries


Last Week's Action Items

  • Magnet to-do's
    • One complete magnet on-site
    • QA's beginning at MMF
  • Nick's to-do's
    • One KEPCO installed UITF, another being installed at MMF for checkout
    • Install/cable dummy load next week
  • Vac to-do's
    • Move pump cart, vent line
    • Remove/stow wastewater Ti window + fast valve gauge
    • Add/support spool - reducer - ceramic - dump
    • Pump down
  • DAQ to-do's
    • cables pulled
    • heliax connectors done
    • PMT connectors ...?
    • DAQ in mech room, ready for the network....
    • Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
  • Detector hut to-do's
    • Assemble BGO/PMT into detector chassis
    • install/instrument collimator + magnet + detector, then rough alignment for check out
    • Prepare for commissioning (collimator, x-ray card, camera), but not magnet nor detector box
  • Greg's to-do's
    • compute integrated asymmetry
    • use slurm to run jobs on farm
    • simulate 5 configurations

DAQ

Beamline

Magnet

Detector

Geant4 Model

Action Items

Documentation