Difference between revisions of "PPB - October 12, 2022"
Jump to navigation
Jump to search
(Created page with "===Coordinates=== * On-site => Wednesdays @ 11am EDT in TL-2236 * Zoom => https://jlab-org.zoomgov.com/j/1609550529?pwd=RlNJYytUSk1tbzNJeUIxNUptTk9UzQT09&from=addon === Agend...") |
|||
(5 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
=== Agenda === | === Agenda === | ||
− | + | ; Joe - near (prototype) and long (cebaf) term plan updates | |
− | * | + | * Andriy arrives next week! |
− | * | + | * I meet w/ Thia, Patrizia, Doug, Andrei to discuss a) physics resources and b) beam functionality for e+ program |
− | * | + | * Developing POC's to develop refined e+ budget estimate in ~4 months (tentatively I set the date at Feb 3) |
+ | ** gun | ||
+ | ** e- injector | ||
+ | ** SRF for e- and e+ | ||
+ | ** target, magnet, RF collection, compression | ||
+ | ** radiation/shielding | ||
+ | ** transport optics | ||
+ | ** spin transport, wien, rotators | ||
+ | ** bi-polar power supplies | ||
+ | ** diagnostics | ||
+ | ** controls, safety | ||
+ | * CLAS invited a presentation in ~3 weeks (11/1 or 11/4) on status and perspectives of e+ at CEBAF | ||
+ | ** high level plan, using LERF | ||
+ | ** last year's LDRD estimates | ||
+ | ** this year's work plan (something like above) | ||
− | ===Ongoing | + | ; Reza - electron injector design status |
+ | ; Yves - 123 MeV e+ transport status | ||
+ | ; Eric - users' update | ||
+ | |||
+ | ===Ongoing topics...?=== | ||
* Sami - evaluate e+ yield and final momentum as a function of capture linac parameters (gradient phase aperture) [[media:Chicane_with_Andriy_s_model_week_5.pdf]] | * Sami - evaluate e+ yield and final momentum as a function of capture linac parameters (gradient phase aperture) [[media:Chicane_with_Andriy_s_model_week_5.pdf]] | ||
* Yves - begin working on injection/extraction lines from linacs | * Yves - begin working on injection/extraction lines from linacs | ||
* Dennis - update LERF to SL transport line to agree better with the FML costing geometry | * Dennis - update LERF to SL transport line to agree better with the FML costing geometry | ||
* Alicia - solicited for emission parameters for GPT, building model of Gun through QCM (desired matchpoint) | * Alicia - solicited for emission parameters for GPT, building model of Gun through QCM (desired matchpoint) | ||
− | * Carlos - evaluate gun voltage and electrode gap for 60 deg and E profiles vs. gap (compared to as built magnetic profile) | + | * Carlos - evaluate gun voltage and electrode gap for 60 deg and E profiles vs. gap (compared to as built magnetic profile) [[Media:Existing Wien capabilities for LERF gun voltage Carlos' slides REVISED.pptx]] |
* S&A will plan to measure LERF relative to CEBAF and cryo points for Joe, Kelly will add FML layout to CEBAF and provide Joe Gubeli points for CEBAF | * S&A will plan to measure LERF relative to CEBAF and cryo points for Joe, Kelly will add FML layout to CEBAF and provide Joe Gubeli points for CEBAF | ||
* Joe Gubeli - would like elegant lines when available, can show them in LERF model | * Joe Gubeli - would like elegant lines when available, can show them in LERF model |
Latest revision as of 09:47, 12 October 2022
Coordinates
- On-site => Wednesdays @ 11am EDT in TL-2236
- Zoom => https://jlab-org.zoomgov.com/j/1609550529?pwd=RlNJYytUSk1tbzNJeUIxNUptTk9UzQT09&from=addon
Agenda
- Joe - near (prototype) and long (cebaf) term plan updates
- Andriy arrives next week!
- I meet w/ Thia, Patrizia, Doug, Andrei to discuss a) physics resources and b) beam functionality for e+ program
- Developing POC's to develop refined e+ budget estimate in ~4 months (tentatively I set the date at Feb 3)
- gun
- e- injector
- SRF for e- and e+
- target, magnet, RF collection, compression
- radiation/shielding
- transport optics
- spin transport, wien, rotators
- bi-polar power supplies
- diagnostics
- controls, safety
- CLAS invited a presentation in ~3 weeks (11/1 or 11/4) on status and perspectives of e+ at CEBAF
- high level plan, using LERF
- last year's LDRD estimates
- this year's work plan (something like above)
- Reza - electron injector design status
- Yves - 123 MeV e+ transport status
- Eric - users' update
Ongoing topics...?
- Sami - evaluate e+ yield and final momentum as a function of capture linac parameters (gradient phase aperture) media:Chicane_with_Andriy_s_model_week_5.pdf
- Yves - begin working on injection/extraction lines from linacs
- Dennis - update LERF to SL transport line to agree better with the FML costing geometry
- Alicia - solicited for emission parameters for GPT, building model of Gun through QCM (desired matchpoint)
- Carlos - evaluate gun voltage and electrode gap for 60 deg and E profiles vs. gap (compared to as built magnetic profile) Media:Existing Wien capabilities for LERF gun voltage Carlos' slides REVISED.pptx
- S&A will plan to measure LERF relative to CEBAF and cryo points for Joe, Kelly will add FML layout to CEBAF and provide Joe Gubeli points for CEBAF
- Joe Gubeli - would like elegant lines when available, can show them in LERF model
- Joe/Fanglei/Amy - exchange ideas/options for e+ spin rotator inside LERF
- Joe - prototype experiment planning media:220831_LERF_injectors.pptx
Reminders
Workshop on Polarized Sources Targets and Polarimetry (PSTP22) - Mainz, Germany, Sept 26-29 2022 [1]
- J. Grames, "Spin Polarized Positron Beam Upgrade for Jefferson Lab", Abstract