Difference between revisions of "PPB - October 26, 2022"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "===Coordinates=== * On-site => Wednesdays @ 11am EDT in TL-2236 * Zoom => https://jlab-org.zoomgov.com/j/1609550529?pwd=RlNJYytUSk1tbzNJeUIxNUptTk9UzQT09&from=addon == Agenda...")
 
 
(One intermediate revision by one other user not shown)
Line 6: Line 6:
 
* All - comments/reactions from those attending Yoshinori's KEKB e+ presentation on Monday
 
* All - comments/reactions from those attending Yoshinori's KEKB e+ presentation on Monday
 
* Joe - JLab e-/e+ topics for U.S.-Japan Science and Technology Cooperation Program in High Energy Physics
 
* Joe - JLab e-/e+ topics for U.S.-Japan Science and Technology Cooperation Program in High Energy Physics
 +
** [https://www.energy.gov/science/articles/department-energy-announces-189-million-us-japan-cooperative-research-high-energy FY22 announcement]
 
* Joe - couple slides request for CLAS12/Hall B collaboration meeting (11/4)
 
* Joe - couple slides request for CLAS12/Hall B collaboration meeting (11/4)
* Sami - QWT collection with cavities
+
* Sami - QWT collection with cavities [[File:Updates_Oct_26.pdf]]
* All - AOB  
+
* All - AOB
  
 
== Last week's Agenda ==
 
== Last week's Agenda ==

Latest revision as of 09:46, 26 October 2022

Coordinates

Agenda

  • All - comments/reactions from those attending Yoshinori's KEKB e+ presentation on Monday
  • Joe - JLab e-/e+ topics for U.S.-Japan Science and Technology Cooperation Program in High Energy Physics
  • Joe - couple slides request for CLAS12/Hall B collaboration meeting (11/4)
  • Sami - QWT collection with cavities File:Updates Oct 26.pdf
  • All - AOB

Last week's Agenda

Joe - near (prototype) and long (cebaf) term plan updates
  • Andriy arrives next week!
  • I meet w/ Thia, Patrizia, Doug, Andrei to discuss a) physics resources and b) beam functionality for e+ program
  • Developing POC's to develop refined e+ budget estimate in ~4 months (tentatively I set the date at Feb 3)
    • gun
    • e- injector
    • SRF for e- and e+
    • target, magnet, RF collection, compression
    • radiation/shielding
    • transport optics
    • spin transport, wien, rotators
    • bi-polar power supplies
    • diagnostics
    • controls, safety
  • CLAS invited a presentation in ~3 weeks (11/1 or 11/4) on status and perspectives of e+ at CEBAF
    • high level plan, using LERF
    • last year's LDRD estimates
    • this year's work plan (something like above)
Reza - electron injector design status
Yves - 123 MeV e+ transport status
Eric - users' update
Older Topics
  • Sami - evaluate e+ yield and final momentum as a function of capture linac parameters (gradient phase aperture) media:Chicane_with_Andriy_s_model_week_5.pdf
  • Yves - begin working on injection/extraction lines from linacs
  • Dennis - update LERF to SL transport line to agree better with the FML costing geometry
  • Alicia - solicited for emission parameters for GPT, building model of Gun through QCM (desired matchpoint)
  • Carlos - evaluate gun voltage and electrode gap for 60 deg and E profiles vs. gap (compared to as built magnetic profile) Media:Existing Wien capabilities for LERF gun voltage Carlos' slides REVISED.pptx
  • S&A will plan to measure LERF relative to CEBAF and cryo points for Joe, Kelly will add FML layout to CEBAF and provide Joe Gubeli points for CEBAF
  • Joe Gubeli - would like elegant lines when available, can show them in LERF model
  • Joe/Fanglei/Amy - exchange ideas/options for e+ spin rotator inside LERF
  • Joe - prototype experiment planning media:220831_LERF_injectors.pptx

Reminders

Workshop on Polarized Sources Targets and Polarimetry (PSTP22) - Mainz, Germany, Sept 26-29 2022 [1]

  • J. Grames, "Spin Polarized Positron Beam Upgrade for Jefferson Lab", Abstract

Shareas