* Joe (10) - Review upcoming meetings/calendar | * Joe (10) - Review upcoming meetings/calendar | ||
* Eric (15) - Characterization and optimization of positron production TN [[media:230208_PosProd.pdf]] | * Eric (15) - Characterization and optimization of positron production TN [[media:230208_PosProd.pdf]] | ||
− | * Sami (15) - S2E simulation for the polarized mode | + | * Sami (15) - S2E simulation for the polarized mode [[media:2023_Injector_layout_whole.pdf]] |
− | * Andriy (10) - Early results for e+ bunch length after target | + | * Andriy (10) - Early results for e+ bunch length after target [[Media:20230208-DriveBeamBunchLength.pptx]] |
* Carlos (5) - Victor's goals during his first visit | * Carlos (5) - Victor's goals during his first visit | ||
**[[Media:Goals for Victor first visit to JLab.docx]] | **[[Media:Goals for Victor first visit to JLab.docx]] |
Latest revision as of 11:02, 8 February 2023
Meeting Coordinates
- On-site => Wednesdays @ 11am EDT in TL-2236
- Zoom => https://jlab-org.zoomgov.com/j/1616149761?pwd=SDJKY3NhWEtBOUR5MVR5RlY1R1pHdz09&from=addon
Agenda
Discussions/Presentations
- Joe (10) - Review upcoming meetings/calendar
- Eric (15) - Characterization and optimization of positron production TN media:230208_PosProd.pdf
- Sami (15) - S2E simulation for the polarized mode media:2023_Injector_layout_whole.pdf
- Andriy (10) - Early results for e+ bunch length after target Media:20230208-DriveBeamBunchLength.pptx
- Carlos (5) - Victor's goals during his first visit
Upcoming Meetings/Dates
- January 26, Winter Hall A Collaboration Meeting - https://indico.jlab.org/event/602/ => please upload presentation to wiki
- February 6, ILC IDT Sources
- T. Omori, e-driven scheme, summary of present status and remaining issues
- Join Zoom Meeting at 9am EDT
- February 13, Xelera visit for e+ SBIR Phase 1 (Test Lab Rm. 1227, 9:30-11:30am)
- All - Meet each other
- Karl+ - Xelera goals and plan
- Joe+ - JLab goals and schedule for LERF
- Sami - Collection scheme
- March 7-8, U. Va. Positron Working Group Meeting, Charlottesville (Joe, Dennis, Sami, Andriy) - https://indico.jlab.org/event/680/
- Joe Grames (20+5) - Ce+BAF concept and the challenging polarized e- source
- Andriy Ushakov (15+5) - Positron target design and fatigue studies
- Sami Habet (15+5) - Concept of a polarized positron injector for CEBAF
- Dennis Turner (15+5) - Delivering e+ beams from LERF through Ce+BAF
- March 8-10, JLab Accelerator Advisory Committee Review
- Andriy (15+5) - High power target for e+ LERF concept
- Sami (15+5) - Positron collection scheme for Ce+BAF
- March 20, SAD begins!
- March 21-24, International Workshop on CLAS12 Physics and Future Perspectives at JLab (Paris)
- Alex - 22 GeV/e+ overview
- Yves - Transport of e+ from LERF to Ce+BAF
- March 23-24, KEK visit @ JLAB
- March 28, Sami returns to IJCLab to write his thesis!
- March 29 - April 5, Mainz Beam Test
- Andriy will attend
- May 15-19, LCWS2023 International Workshop on Linear Colliders (Andriy) - https://indico.slac.stanford.edu/event/7467/overview
- May 7-12, IPAC'23
- G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun" media:abstract-1233.pdf
- J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" media:abstract-1313.pdf
- R. Kazimi et al., "Polarized Electron Injector for Positron Capability at CEBAF 12 GeV" media:abstract-1917.pdf
- A. Sy et al., "Degrader beamline design at the CEBAF injector for machine acceptance studies" media:Amy_Sy-IPAC23.pdf
- A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" media:abstract-1794.pdf
- Summer TBD, Positron workshop (To be announced)