1- Bubble Chamber progress at Argonne
 
1- Bubble Chamber progress at Argonne
  
2- Bubble Chamber Schedule at JLab
+
2- Electron line status
  
:: Layout [[media:140513_Layout.pdf]]
+
:: Layout [[media:140514_BubbleLayout.pdf]]
:: New dipole
 
:: Beam line
 
 
:: Radiator [[media:140513_Radiator.pdf]]
 
:: Radiator [[media:140513_Radiator.pdf]]
:: Bubble Resource List
+
 
* Sketch or list showing equipment in tunnel
+
3- Schedule
* Sketch or list showing equipment in service building
+
 
* Cable pulls
+
: Planning meetings
* Remote controls
+
:: reviews
:: Schedule
+
:: install kick-off
* Administrative
+
:: commissioning plan
** install kick-off
+
 
** reviews
+
: Electron Line
** commissioning plan
+
:: dismantle 5D
* Vacuum line
+
:: fab/buy/build
** dismantle 5D
+
:: install
** fab/buy/build
+
:: controls
** install
+
:: checkout
** controls
+
 
** checkout
+
: Prep work for chamber
* Bubble chamber
+
:: tunnel resources
** ship
+
:: service building resources
** install
+
:: control room resources
** controls
+
 
** checkout
+
: Install of chamber
** commissioning plan
+
:: ship estimate
 +
:: install/checkout goals
 +
:: commissioning/test goals
 +
 
 +
 
 +
 
 +
----
 +
 
 +
'''Notes from this meeting:'''
 +
 
 +
* Bubble Chamber is ready to be filled with N<sub>2</sub>O.
 +
* Once ready, all safety documents must be forwarded to D. Meekins.
 +
* The chamber will be shipped with mercury in place but not N<sub>2</sub>O.
 +
 
 +
 
 +
* Magnet dipole is signed off and out for bids.
 +
* The Hall Probe has arrived at JLab.
 +
* Magnet Alignment Fixture is being fabricated by the Machine Shop.
 +
 
 +
 
 +
* The collimator table and holders will be made of aluminum.
 +
* The table should be wide enough to stack copper bricks to shield the back scattered gammas, if needed.
 +
* Need a list from Argonne of all the resources needed to run the bubble chamber (cables, power, ...).
 +
 
 +
 
 +
* Here is a sketch of the Injector Tunnel, Injector Service Building (ISB) and the Machine Control Center (MCC): [[media:JLab_sketch.pdf]] [[media:JLab_sketch.pptx]]

Latest revision as of 12:34, 20 May 2014

We will meet in TL 2236 on Wednesday May 14 at 3:30 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

1- Bubble Chamber progress at Argonne

2- Electron line status

Layout media:140514_BubbleLayout.pdf
Radiator media:140513_Radiator.pdf

3- Schedule

Planning meetings
reviews
install kick-off
commissioning plan
Electron Line
dismantle 5D
fab/buy/build
install
controls
checkout
Prep work for chamber
tunnel resources
service building resources
control room resources
Install of chamber
ship estimate
install/checkout goals
commissioning/test goals



Notes from this meeting:

  • Bubble Chamber is ready to be filled with N2O.
  • Once ready, all safety documents must be forwarded to D. Meekins.
  • The chamber will be shipped with mercury in place but not N2O.


  • Magnet dipole is signed off and out for bids.
  • The Hall Probe has arrived at JLab.
  • Magnet Alignment Fixture is being fabricated by the Machine Shop.


  • The collimator table and holders will be made of aluminum.
  • The table should be wide enough to stack copper bricks to shield the back scattered gammas, if needed.
  • Need a list from Argonne of all the resources needed to run the bubble chamber (cables, power, ...).