Line 28: | Line 28: | ||
* Bubble Chamber is filled with N<sub>2</sub>O. | * Bubble Chamber is filled with N<sub>2</sub>O. | ||
− | * ... mercury and N<sub>2</sub>O problem ... | + | * ... mercury, glass, and N<sub>2</sub>O problem ... |
* When attempted to vent the beamline to install the Fast Valve, it was found that the valve immediately after the 1/4 cryo-unit is leaking. It was decided to warm the 1/4 cryo-unit to room temperature and replace the leaky valve. | * When attempted to vent the beamline to install the Fast Valve, it was found that the valve immediately after the 1/4 cryo-unit is leaking. It was decided to warm the 1/4 cryo-unit to room temperature and replace the leaky valve. | ||
* The new magnet alignment fixture has been built. | * The new magnet alignment fixture has been built. |
Revision as of 18:25, 12 June 2014
We will meet in TL 2236 on Wednesday June 11 at 3:30 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1 - Bubble Chamber progress at Argonne
2 - (Grames) Beam line progress at JLab:
- * Coordination meeting (May 28) media:140527_BubbleInstallKickoff.pptx media:140527_BubbleInstallKickoff.pdf
- * Review final girder components
- Assembly media:JL0015130 COLLIMATOR TABLE ASSEMBLY.pdf
- Radiator media:JL0015733 CU RADIATOR WINDOW ASSY.pdf
- Collimator media:JL0015777 CU COLLIMATOR.pdf
- * BPM bench top calibration using Goubau surface wave transmission line (G-line) technique
3 - (All) How to proceed with readiness review (beam line, safety, radiological, commissioning plan, ?) so the beam line is ready for commissioning at the end of summer ?
Notes from this meeting:
- PAC41 listed the Bubble Chamber as a High Impact experiment.
- Bubble Chamber is filled with N2O.
- ... mercury, glass, and N2O problem ...
- When attempted to vent the beamline to install the Fast Valve, it was found that the valve immediately after the 1/4 cryo-unit is leaking. It was decided to warm the 1/4 cryo-unit to room temperature and replace the leaky valve.
- The new magnet alignment fixture has been built.
- Dave and Brad will decide on who and where the collimator will be built. The design is complete and the drawing is ready.
- Radiator design has been completed.
- The chamber location may have to be pushed downstream by an inch or two to allow for the thermal insulation. The chamber will be running at -12 to -14 °C. Instead of having the Survey and Alignment group marking 4 points on the floor for the chamber, they will mark two parallel line.
- The beamline two BPMs will be calibrated using G-line technique. The goal is to improve the absolute beam position measurements needed for the energy determination.
- Rolf and Arne will decide on the exact framework of the Bubble Chamber Readiness Review but expected to be like PEPPo:
- Conduct of Operations (COO)
- Experiment Safety Assessment Document (ESAD)
- Radiation Safety Assessment Document (RSAD)
- Beamline Review
- Bubble Chamber Safety Review:
- Pressure System
- Mercury
- Laughing Gas
- Operational Safety Procedure (OSP)
- Claudio, Simona, Darren, and Wouter have started the work on GEANT4 simulation of the Bubble Chamber.
- ... Claudio plans for a gamma detector ...