Difference between revisions of "Bubble Demo ME May 9, 2014"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
: (Shaun/Joe) Finalize/sign drawings => Done? | : (Shaun/Joe) Finalize/sign drawings => Done? | ||
: (Tim) Identify vendor for DL? => PR#343083 to get quotes from Alpha Magnetics, New England Technicoil, Stangnes Industries | : (Tim) Identify vendor for DL? => PR#343083 to get quotes from Alpha Magnetics, New England Technicoil, Stangnes Industries | ||
− | : (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate => | + | : (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate => Shaun will ask Tim to be made... |
'''Beamline layout''' | '''Beamline layout''' | ||
: (Shaun) Send Joe copy of layout => Done | : (Shaun) Send Joe copy of layout => Done | ||
− | : (Joe) Help categorize component inventory | + | : (Joe) Help categorize component inventory => Joe sit w/ Phil make list |
:: re-use from tunnel, on shelf, buy part, design/fab part | :: re-use from tunnel, on shelf, buy part, design/fab part | ||
: (Shaun) Bellows arrangement | : (Shaun) Bellows arrangement |
Revision as of 08:12, 8 May 2014
We will meet Friday May 9 @ 9am in TL-2236.
SUMMER Installation
DL Items
- (Shaun/Joe) Finalize/sign drawings => Done?
- (Tim) Identify vendor for DL? => PR#343083 to get quotes from Alpha Magnetics, New England Technicoil, Stangnes Industries
- (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate => Shaun will ask Tim to be made...
Beamline layout
- (Shaun) Send Joe copy of layout => Done
- (Joe) Help categorize component inventory => Joe sit w/ Phil make list
- re-use from tunnel, on shelf, buy part, design/fab part
- (Shaun) Bellows arrangement
- (Shaun) Modify support of "green" girder
- (Shaun) Plan/schedule for drawings and fabrication
- (Riad) Aluminum photon dump dimensions
Beamline components
- (Joe) Are MBH corrector strengths sufficient?
- (Joe M.) Is radiator cooling flange sufficient?
Bubble Chamber Alignment
- (Riad/Brad/Shaun) Mounting in tunnel
- (Riad/Brad/Shaun) Chamber alignment capability
FINAL installation
- Identify suitable dump dipole and its dimensions