== Readiness Updates ==
 
== Readiness Updates ==
* Vacuum component layout/shielding
+
* ME/vacuum component layout/shielding
 
** Updated ME model w/ dimensions (collimator length, insertable aperture, stand points)
 
** Updated ME model w/ dimensions (collimator length, insertable aperture, stand points)
 
** Vacuum assembly later today (add aperture, spool, reducer, ceramic, dump)
 
** Vacuum assembly later today (add aperture, spool, reducer, ceramic, dump)
 
** Schedule S&A as-found
 
** Schedule S&A as-found
 +
** Max - names/dimensions for beam line elements
 +
** Mike - update songsheet w/ names
  
 
* Detector table/shielding
 
* Detector table/shielding
Line 19: Line 21:
 
* Detector status
 
* Detector status
 
** Detector Triax (4) and SHV (2) => cables pulled and hanging near dump
 
** Detector Triax (4) and SHV (2) => cables pulled and hanging near dump
** DAQ status/readiness
+
** DAQ status
** Assemble BGO/PMT into detector chassis
+
** Assemble BGO/PMT and detector chassis
  
 
* Magnet
 
* Magnet
 +
** Magnet QA, measurement/model benchmarking, readiness for installation
 
** Magnet PS cables => pulled to power load on wall
 
** Magnet PS cables => pulled to power load on wall
 
** Rack/magnet ground cable => bounded to braid near dump
 
** Rack/magnet ground cable => bounded to braid near dump
Line 31: Line 34:
 
** A6 current monitor => Radiator
 
** A6 current monitor => Radiator
  
* Position/Size
+
* Beam Position/Size diagnostics upstream of Dump
 
** Harp installed upstream of dump
 
** Harp installed upstream of dump
 
** BPM installed upstream of dump
 
** BPM installed upstream of dump
Line 38: Line 41:
  
 
* SImulations
 
* SImulations
** compute integrated asymmetry
+
** Greg - Update model to include positions of FCUP, Aperture, Tube, Dump, Shielding
** use slurm to run jobs on farm
+
** Max - Beam size model at 5 MeV
** simulate 5 configurations
 
  
 
===DAQ ===
 
===DAQ ===
Line 63: Line 65:
 
* BGO - (2) on-hand [[media:IMG_20220804_084436318.jpg|thumb]] [[media:IMG_20220811_154533240.jpg|thumb]] [[media:IMG_20220811_154547652.jpg|thumb]] [[media:IMG_20220811_154606586.jpg|thumb]] [[media:IMG_20220811_154619455.jpg|thumb]]
 
* BGO - (2) on-hand [[media:IMG_20220804_084436318.jpg|thumb]] [[media:IMG_20220811_154533240.jpg|thumb]] [[media:IMG_20220811_154547652.jpg|thumb]] [[media:IMG_20220811_154606586.jpg|thumb]] [[media:IMG_20220811_154619455.jpg|thumb]]
 
* PMT and mu shields - (4) on-hand [[media:IMG_20220804_081738760.jpg|thumb]]
 
* PMT and mu shields - (4) on-hand [[media:IMG_20220804_081738760.jpg|thumb]]
 
===Geant4 Model===
 
*
 
 
===Action Items===
 
  
 
===Documentation===
 
===Documentation===
 
* NIM - Elsevier Article (elsarticle) template => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
 
* NIM - Elsevier Article (elsarticle) template => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
 
* Manual - Sharepoint
 
* Manual - Sharepoint

Latest revision as of 19:23, 7 September 2022

Thursday's @ 9am EDT by Zoom

New UITFList entries

Readiness Updates

  • ME/vacuum component layout/shielding
    • Updated ME model w/ dimensions (collimator length, insertable aperture, stand points)
    • Vacuum assembly later today (add aperture, spool, reducer, ceramic, dump)
    • Schedule S&A as-found
    • Max - names/dimensions for beam line elements
    • Mike - update songsheet w/ names
  • Detector table/shielding
    • Waiting on table top, then rails/posts assembly
    • Drawings for lead hut assembly
  • Detector status
    • Detector Triax (4) and SHV (2) => cables pulled and hanging near dump
    • DAQ status
    • Assemble BGO/PMT and detector chassis
  • Magnet
    • Magnet QA, measurement/model benchmarking, readiness for installation
    • Magnet PS cables => pulled to power load on wall
    • Rack/magnet ground cable => bounded to braid near dump
  • Current monitoring
    • Faraday cups current monitor => Ganged with FCUP
    • A5 current monitor => 7mm aperture, requires I&C controls (Windham next week)
    • A6 current monitor => Radiator
  • Beam Position/Size diagnostics upstream of Dump
    • Harp installed upstream of dump
    • BPM installed upstream of dump
    • Beam line viewer => Matt repaired, requires camera alignment
    • X-ray viewer => Joe relocated to look at detector hut, requires X-ray card
  • SImulations
    • Greg - Update model to include positions of FCUP, Aperture, Tube, Dump, Shielding
    • Max - Beam size model at 5 MeV

DAQ

Beamline

Magnet

Detector

Documentation