We will meet in TL 2236 on Wednesday June 11 at 3:30 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1 - Bubble Chamber progress at Argonne
2 - (Grames) Beam line progress at JLab:
- * Coordination meeting (May 28) media:140527_BubbleInstallKickoff.pptx media:140527_BubbleInstallKickoff.pdf
- * Review final girder components
- Assembly media:JL0015130 COLLIMATOR TABLE ASSEMBLY.pdf
- Radiator media:JL0015733 CU RADIATOR WINDOW ASSY.pdf
- Collimator media:JL0015777 CU COLLIMATOR.pdf
- * BPM bench top calibration using Goubau surface wave transmission line (G-line) technique
3 - (All) How to proceed with readiness review (beam line, safety, radiological, commissioning plan, ?) so the beam line is ready for commissioning at the end of summer ?
Notes from this meeting:
- Bubble Chamber is filled with N2O.
- Rolf and Arne will decide on the exact framework of the Bubble Chamber Readiness Review but expected to be exactly like PEPPo:
- Conduct of Operations (COO)
- Experiment Safety Assessment Document (ESAD)
- Radiation Safety Assessment Document (RSAD)
- Beamline Review
- Bubble Chamber Safety Review:
- Pressure System
- Mercury
- Laughing Gas
- Operational Safety Procedure (OSP)