User contributions
Jump to navigation
Jump to search
- 07:42, 5 July 2016 diff hist 0 N File:Potential Near Anode checking biasing.pptx current
- 07:41, 5 July 2016 diff hist +144 GTS meeting 7 05 16
- 07:39, 5 July 2016 diff hist +4,180 N GTS meeting 7 05 16 Created page with "* 1. Using an inverted geometry ceramic insulator gun, and home-made multi-alkali photocathode, we have demonstrated 300 keV beam a, at 1-mA DC sustained albeit for about 30 m..."
- 07:33, 5 July 2016 diff hist +6 Gun Test Stand Meeting Minutes and To-Do Lists
- 07:33, 5 July 2016 diff hist +112 Gun Test Stand Meeting Minutes and To-Do Lists
- 11:37, 27 June 2016 diff hist +175 Talk:GTS meeting 6 27 16 current
- 11:15, 27 June 2016 diff hist +75 Talk:GTS meeting 6 27 16
- 11:13, 27 June 2016 diff hist +4 Talk:GTS meeting 6 27 16
- 11:05, 27 June 2016 diff hist +287 N Talk:GTS meeting 6 27 16 Created page with "* Things to try next, in order: 1. Run with the beam viewers shields completely out for improved pumping speed, 2. Bias anode positive, John hsa PS 3. Increase laser spot size..."
- 10:14, 27 June 2016 diff hist +75 GTS meeting 6 27 16 current
- 10:12, 27 June 2016 diff hist 0 N File:Bialkali Photocathode Update 062416.pptx current
- 10:12, 27 June 2016 diff hist +51 GTS meeting 6 27 16
- 10:10, 27 June 2016 diff hist +1,873 N GTS meeting 6 27 16 Created page with "* While attempting to run 1 mA DC beam, there are current excursions that trip off th gun HVPS (trip limit set to 2 mA). The excursions result in localized cathode damage, whi..."
- 10:00, 27 June 2016 diff hist +131 Gun Test Stand Meeting Minutes and To-Do Lists
- 14:46, 21 June 2016 diff hist +62 GTS meeting 6 20 16 current
- 14:44, 21 June 2016 diff hist +48 GTS meeting 6 20 16
- 14:43, 21 June 2016 diff hist -48 GTS meeting 6 20 16
- 14:40, 21 June 2016 diff hist 0 N File:First photocathode QE with beam.pdf current
- 14:34, 21 June 2016 diff hist +48 GTS meeting 6 20 16
- 14:32, 21 June 2016 diff hist +1,020 N GTS meeting 6 20 16 Created page with "* [https://logbooks.jlab.org/entry/3410840 1 mA to the dump! at 275 kV] ** The QE was estimated to be around 0.3% ** We discovered that the Haimson coil corrector was not stee..."
- 09:21, 21 June 2016 diff hist +64 Gun Test Stand Meeting Minutes and To-Do Lists →Gun Test Stand Meetings
- 15:24, 14 June 2016 diff hist +752 N GTS meeting 6 14 16 Created page with "* Updates! ** John shorted out the conditioning resistor and filled back the HVPS SF6 tank to 10 psi ** Second pico-ammeter connected with GPIB, to gun anode, needs channel n..." current
- 14:47, 14 June 2016 diff hist +114 Gun Test Stand Meeting Minutes and To-Do Lists →Gun Test Stand Meetings
- 14:00, 31 May 2016 diff hist +264 GTS meeting 5 31 16 current
- 13:11, 31 May 2016 diff hist 0 N File:GTS 1p7 uA 300keV beam at dump..after running for 1 hr.jpg current
- 13:11, 31 May 2016 diff hist +185 GTS meeting 5 31 16
- 12:53, 31 May 2016 diff hist +944 GTS meeting 5 31 16
- 12:43, 31 May 2016 diff hist 0 N File:GTS 1p6 uA 300keV beam at Dump.jpg current
- 12:42, 31 May 2016 diff hist +672 N GTS meeting 5 31 16 Created page with "* We ran beam for RadCon Surveys ** 300 kV beam on the dump! ** File:GTS 1p6 uA 300keV beam at Dump.jpg ** The laser variable attenuator is not working, so we started to..."
- 12:38, 31 May 2016 diff hist +61 Gun Test Stand Meeting Minutes and To-Do Lists →Gun Test Stand Meetings
- 11:36, 25 May 2016 diff hist 0 File:RadiaBeam steerers testdata.xlsx Chgarcia uploaded a new version of File:RadiaBeam steerers testdata.xlsx current
- 11:36, 25 May 2016 diff hist 0 File:RadiaBeam steerers testdata.xlsx Chgarcia uploaded a new version of File:RadiaBeam steerers testdata.xlsx
- 11:35, 25 May 2016 diff hist 0 File:RadiaBeam steerers testdata.xlsx Chgarcia uploaded a new version of File:RadiaBeam steerers testdata.xlsx
- 11:35, 25 May 2016 diff hist 0 N File:RadiaBeam steerers testdata.xlsx
- 11:32, 25 May 2016 diff hist +37 Beam line
- 11:31, 25 May 2016 diff hist 0 N File:GTS Solenoid 002 Integrals.xlsx current
- 11:31, 25 May 2016 diff hist +41 Beam line
- 11:30, 25 May 2016 diff hist 0 N File:GTS Solenoid 001 Integrals.xlsx current
- 11:30, 25 May 2016 diff hist +197 N Beam line Created page with "* This is the field map for MFGGT01: Media:GTS Solenoid 001 Integrals.xlsx * This is the field map for MFGGT02: * This is the data sent by RadiaBeam for the steering magne..."
- 11:28, 25 May 2016 diff hist +16 Gun Test Stand documents and drawings
- 13:54, 24 May 2016 diff hist +3 GTS meeting 5 24 16 current
- 13:48, 24 May 2016 diff hist 0 N File:ITVGT01 ambient light + QE laser light.png current
- 13:47, 24 May 2016 diff hist +51 GTS meeting 5 24 16
- 13:46, 24 May 2016 diff hist 0 N File:ITVGT01 ambient light.png current
- 13:46, 24 May 2016 diff hist +34 GTS meeting 5 24 16
- 13:43, 24 May 2016 diff hist +1,853 N GTS meeting 5 24 16 Created page with "* After demonstrating beam last week, we need RadCon approval before continuing to thread beam to the dump. ** A procedure was submitted by Carlos to Vashek Valet and a test r..."
- 13:26, 24 May 2016 diff hist +88 Gun Test Stand Meeting Minutes and To-Do Lists →Gun Test Stand Meetings
- 15:33, 17 May 2016 diff hist +408 Talk:GTS meeting 5 17 16 current
- 15:14, 17 May 2016 diff hist +638 N Talk:GTS meeting 5 17 16 Created page with "* Action items * Shukui wants a camera looking at the cathode, to aid steering the laser spot on the cathode. * QE : We have a QE scanner optics setup and chassis. We also ha..."
- 10:02, 17 May 2016 diff hist +41 GTS meeting 5 17 16 current