User contributions
Jump to navigation
Jump to search
- 06:59, 28 August 2020 diff hist 0 AIPINJ - Layouts
- 06:58, 28 August 2020 diff hist +58 CEBAF Injector Upgrade
- 15:26, 27 August 2020 diff hist -68 CEBAF Injector Upgrade
- 15:23, 27 August 2020 diff hist +239 CEBAF Injector Upgrade
- 14:54, 27 August 2020 diff hist -65 AIPINJ - Phase 1 and 2 Schedule
- 14:53, 27 August 2020 diff hist +46 AIPINJ - Phase 1 and 2 Schedule
- 14:51, 27 August 2020 diff hist -24 CEBAF Injector Upgrade
- 14:51, 27 August 2020 diff hist +17 CEBAF Injector Upgrade
- 14:50, 27 August 2020 diff hist -53 CEBAF Injector Upgrade
- 14:49, 27 August 2020 diff hist +8,266 N AIPINJ - Upgrade Meetings Created page with "==2020== August 31, 2020 - AIPINJ Phase 1 Planning Meeting August 27, 2020 - ME/INJ/CIS/CASA August 20, 2020 - ME/INJ/CIS/CASA August 13, 2020 - ME/INJ/CIS/CA..."
- 14:49, 27 August 2020 diff hist -8,266 Injector Upgrade Meetings Blanked the page current
- 14:49, 27 August 2020 diff hist +11 CEBAF Injector Upgrade
- 14:48, 27 August 2020 diff hist +3,404 N AIPINJ - Layouts Created page with "==Overall Phase 1 & 2 AIPINJ Layouts== Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], w..."
- 14:48, 27 August 2020 diff hist -3,404 AIPINJ Layouts Blanked the page current
- 14:47, 27 August 2020 diff hist +214 N SRF Booster Created page with "A new SRF booster cryomodule was designed and built to boost a 200 keV beam up to 533 keV (2 cell) and then to MeV energies (7 cell). ==SRF Drawings== * drawing from Jim Henr..."
- 14:47, 27 August 2020 diff hist -16 CEBAF Injector Upgrade
- 14:47, 27 August 2020 diff hist -214 SRF Booster - 2 cell/9 cell Blanked the page current
- 14:46, 27 August 2020 diff hist +214 N SRF Booster - 2 cell/9 cell Created page with "A new SRF booster cryomodule was designed and built to boost a 200 keV beam up to 533 keV (2 cell) and then to MeV energies (7 cell). ==SRF Drawings== * drawing from Jim Henr..."
- 14:46, 27 August 2020 diff hist -81 AIPINJ Layouts
- 14:45, 27 August 2020 diff hist +33 CEBAF Injector Upgrade
- 14:44, 27 August 2020 diff hist -230 AIPINJ Layouts
- 14:43, 27 August 2020 diff hist +152 Pre-buncher cavity (200 kV upgrade)
- 14:42, 27 August 2020 diff hist +156 Chopping System (200 kV upgrade) current
- 14:38, 27 August 2020 diff hist +3,715 AIPINJ Layouts
- 14:38, 27 August 2020 diff hist -3,715 AIPINJ Layouts Blanked the page
- 14:38, 27 August 2020 diff hist +23 CEBAF Injector Upgrade
- 14:37, 27 August 2020 diff hist +13 CEBAF Injector Upgrade
- 14:35, 27 August 2020 diff hist +277 N AIPINJ - Phase 1 and 2 Schedule Created page with "Pre-COVID Plan (Fall 2019) :: Run (now - May 6) :: Phase 1 (May 6 - end of 2020) :: Run (Jan 2021 - Sep 13 2021) :: Phase 2 (Sep 13 - end of 2021) COVID Plan (Summer 2020) ::..."
- 14:33, 27 August 2020 diff hist -82 CEBAF Injector Upgrade
- 14:31, 27 August 2020 diff hist -41 CEBAF Injector Upgrade
- 14:31, 27 August 2020 diff hist +65 Injector upgrade vacuum improvements current
- 14:30, 27 August 2020 diff hist +12 Injector upgrade vacuum improvements
- 14:29, 27 August 2020 diff hist +145 N Injector upgrade vacuum improvements Created page with "; Vacuum design ; NEG coating ; Getters ; Ion pumps Ion Pump Power Supplies - February 20, 2019 - Discuss future IP and IP PS requirements"
- 14:29, 27 August 2020 diff hist -90 Ion Pump Power Supplies Blanked the page current
- 14:28, 27 August 2020 diff hist +106 CEBAF Injector Upgrade
- 14:26, 27 August 2020 diff hist -31 CEBAF Injector Upgrade
- 14:26, 27 August 2020 diff hist +649 N A1/A2 Aperture Steering Cubes Created page with "The A1 and A2 apertures define injector acceptance into the chopping system, additionally the A2 aperture is the beam stopper for the PSS kicker. ; HD steering coils ; A1 mo..."
- 14:24, 27 August 2020 diff hist -577 A1 Aperture Motor Control Blanked the page current
- 14:24, 27 August 2020 diff hist +144 CEBAF Injector Upgrade
- 14:21, 27 August 2020 diff hist +212 N Pre-buncher cavity (200 kV upgrade) Created page with "A new buncher cavity (called the pre-buncher b/c there it precedes the main 1497 MHz bunching cavity) built from copper (rather than existing stainless steel) in order to best..."
- 14:19, 27 August 2020 diff hist -17 CEBAF Injector Upgrade
- 14:18, 27 August 2020 diff hist +7 CEBAF Injector Upgrade
- 14:18, 27 August 2020 diff hist -23 CEBAF Injector Upgrade
- 14:18, 27 August 2020 diff hist +456 N NEG coated 2.5 inch OD BPM's Created page with "New BPM's were developed for the 200 kV gun NEG tube beam line. Please see Region 1 released drawings for prints. ;Performance Notes * BPM #1 * BPM #2 * BPM #3 * BPM #4 ;De..."
- 14:18, 27 August 2020 diff hist -456 200KV gun BPM's Blanked the page current
- 14:17, 27 August 2020 diff hist -63 CEBAF Injector Upgrade
- 14:17, 27 August 2020 diff hist +425 N Chopping System (200 kV upgrade) Created page with "The beam chopping system is a pair (xy) RF deflecting cavities spanning a vacuum chamber with apertures to chop and define the beam. ;RF cavity upgrade ;RF amplifier upgrade..."
- 14:14, 27 August 2020 diff hist +38 CEBAF Injector Upgrade
- 14:13, 27 August 2020 diff hist +1 CEBAF Injector Upgrade
- 14:12, 27 August 2020 diff hist +208 CEBAF Injector Upgrade