UITF Procedures not managed via document control

From Ciswikidb
Revision as of 13:55, 25 September 2020 by Chgarcia (talk | contribs)
Jump to navigation Jump to search

photogun related procedures

laser related

techniques to set the UITF buncher phase and gradient

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

notes on sweeping the UITF enclosure and making it safe after beam operations

  • overview of the sweep procedure for UITF, including pre-sweep steps

machine protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

HDIce-related