PPB - October 12, 2022

From Ciswikidb
Revision as of 09:29, 12 October 2022 by Grames (talk | contribs)
Jump to navigation Jump to search

Coordinates

Agenda

Joe - near (prototype) and long (cebaf) term plan updates
  • Andriy arrives next week!
  • I meet w/ Thia, Patrizia, Doug, Andrei to discuss a) physics resources and b) beam functionality for e+ program
  • CLAS invited a presentation (11/1 or 11/4) on status and perspectives of e+ at CEBAF
  • Developing POC's to develop refined e+ budget estimate in ~4 months (tentatively I set the date at Feb 3)
Reza - electron injector design status
Yves - 123 MeV e+ transport status
Eric - users' update

Ongoing topics...?

  • Sami - evaluate e+ yield and final momentum as a function of capture linac parameters (gradient phase aperture) media:Chicane_with_Andriy_s_model_week_5.pdf
  • Yves - begin working on injection/extraction lines from linacs
  • Dennis - update LERF to SL transport line to agree better with the FML costing geometry
  • Alicia - solicited for emission parameters for GPT, building model of Gun through QCM (desired matchpoint)
  • Carlos - evaluate gun voltage and electrode gap for 60 deg and E profiles vs. gap (compared to as built magnetic profile) Media:Existing Wien capabilities for LERF gun voltage Carlos' slides REVISED.pptx
  • S&A will plan to measure LERF relative to CEBAF and cryo points for Joe, Kelly will add FML layout to CEBAF and provide Joe Gubeli points for CEBAF
  • Joe Gubeli - would like elegant lines when available, can show them in LERF model
  • Joe/Fanglei/Amy - exchange ideas/options for e+ spin rotator inside LERF
  • Joe - prototype experiment planning media:220831_LERF_injectors.pptx

Reminders

Workshop on Polarized Sources Targets and Polarimetry (PSTP22) - Mainz, Germany, Sept 26-29 2022 [1]

  • J. Grames, "Spin Polarized Positron Beam Upgrade for Jefferson Lab", Abstract

Shareas