Feb 7, 2023 - CIS Group meeting
Jump to navigation
Jump to search
Agenda
Upcoming CEBAF/UITF jobs
- SAD is coming ... media:SAD_discussion_300123.pdf
- Warm girder assembly (upcoming plans, using UITF or LERF)
- Status of UITF (booster, status of gun testing)
- CEBAF "200 kV" jobs (vacuum/table "hooksup" of 200 kV gun, Phil's harp plan)
Group Updates
- Upcoming meeting
- Updates from around the room
Upcoming Meetings/Dates
- February 10, Alex's deadline to update for March GSRA meeting
- February 13, Xelera visit for e+ SBIR Phase 1 (Karl, Val, Colwyn, Joe)
- March 5-10, APS Meeting, Las Vegas (Riad, Matt) - https://march.aps.org/
- March 7-8, U. Va. Positron Working Group Meeting, Charlottesville (Joe, Dennis, Sami, Andriy) - https://indico.jlab.org/event/680/
- March 8-10, JLab Accelerator Advisory Committee Review
- March 15, GSRA Annual Review (1-4 pm)
- March 20, SAD Begins
- Shawn's recent calendar media:SAD_discussion_300123.pdf
- March 23-24, KEK visit Yoshinori+
- May 7-12, IPAC'23
- G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". media:abstract-1233.pdf
- J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" media:abstract-1313.pdf
- M. Rahman et al., "Quantum Efficiency and Lifetime Study for Negative Electron Affinity GaAs Nanopillar Array Photocathode" media:IPAC23 abstract_Aziz.pdf
- A. Ushakov et al., "Conceptual Design of a High-Power Target for Positron Production at CEBAF" media:abstract-1794.pdf
- S. Zhang, "What We Learned From Operating Electron Accelerators with Variable bunch Frequencies at JLab" media:IPAC23 abstract_Zhang.pdf
- May 15-19, LCWS2023 International Workshop on Linear Colliders (Andriy) - https://indico.slac.stanford.edu/event/7467/overview