August 14, 2013
Revision as of 14:01, 14 August 2013 by Mjmchugh (talk | contribs) (→For those calling in we'll use the ReadyTalk audio conference system.)
We will meet in TED 2561B on Wednesday August 14 at 3pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 3441852, followed by “#”
- Mamun
- SEM imaging of 1um and 0.5um gold foils
- Media:130812_SEM_Imaging_Gold.pptx
- Sam (in abstentia)
- Final report on beam optimization, multiple scattering and dump plat power distribution
- Mott Polarimeter Upgrade at Jefferson Lab (June 2013) Media:SamRhodes_Final.pdf
- Joe
- Schedule, ladder and dump updates
- Media:130814_MottUpdate_Grames.pdf
- Marty
- Modeling update Media:Simulation_Update_2013-08-14.pdf
- PSTP status
- PSTP
For the Mott polarimeter we are making a real top-down assessment with improvements where objective is a test of the polarimeter precision. To do this we are addressing various areas:
- improvements and measurements of targets and collimator acceptance
- reduction of backgrounds through lower-Z materials and TOF laser pulse selection
- fully new Geant4 model of polarimeter geometry, including polarization processes
- theory estimates on Sherman function, dominant systematic uncertainty
- higher beam power mode of operation for systematic studies
- modern parity-style FADC based DAQ for beam instrumentation and detector collection
- new HVPS control system
- improvement of signal:noise