Difference between revisions of "Apr 18, 2023 - CIS Group Meeting"
Jump to navigation
Jump to search
(Created page with "== Agenda == * Gabriel - GTS update ====SAD jobs for the next ==== :* Joe - gun alignment :* Carlos - HV processing :* Marcy - remaining vacuum tasks :* Steve - status new s...") |
|||
(11 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
== Agenda == | == Agenda == | ||
− | * | + | ==== General ==== |
+ | * You're doing a good job keeping safety training current => continue to be proactive, don't let it expire | ||
− | ==== | + | ==== GTS ==== |
− | + | * Gabriel HV insulator test April summary [[media: 500_kV_project_update_April_2023.pptx]] | |
− | |||
− | : | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | ==== SAD Gun Jobs ==== | |
− | + | * Joe - gun table alignment | |
− | + | * Carlos - HV OSP, read for conditioning: [[Media:Gun HV conditioniong schedule SAD 2023 Rev02.pptx]] | |
− | + | * Marcy - remaining vacuum tasks, harp done?, chopper valve/bake region | |
− | * | + | * Steve - Hall A laser, LLRF gone early June |
− | * | + | * Max - ready for beam tests? |
+ | * Riad - 200 kV Wien - 20 Amp PS, update on Moller tasks (IA, RPT, grounding), Keithley 485 picoameter | ||
+ | * Shukui - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size | ||
− | * | + | ==== Upcoming meetings/travel/presentations ==== |
− | :* | + | * May |
− | :* | + | :* 5-13, IPAC'23 contributions (Greg, Aziz, Andriy, Joe, Reza, Amy) |
− | + | :* 15, 2023 CCM & IMEKO TC16 7th International Conference on Pressure and Vacuum Metrology (Marcy) | |
− | :* | + | :* 15-19 LCWS (Andriy, Carlos) |
− | + | * Jun | |
− | :* | + | :* USPAS (Max) |
− | :* | + | :* 5-9 APS DAMOP Meeting (Riad, Matt G.) |
− | + | :* 28, JLab User Group e+ update (Joe) | |
− | + | * Jul | |
− | :* | + | :* Summer student PES talk (Riad) |
− | :* | + | :* Summer student e+ talk (Yves) |
− | + | * Aug | |
− | * | + | :* ? |
− | + | * Sep | |
− | * | + | :* IBIC (Max) |
− | * | ||
− | * | ||
− | * | ||
− |
Latest revision as of 10:47, 18 April 2023
Agenda
General
- You're doing a good job keeping safety training current => continue to be proactive, don't let it expire
GTS
- Gabriel HV insulator test April summary media: 500_kV_project_update_April_2023.pptx
SAD Gun Jobs
- Joe - gun table alignment
- Carlos - HV OSP, read for conditioning: Media:Gun HV conditioniong schedule SAD 2023 Rev02.pptx
- Marcy - remaining vacuum tasks, harp done?, chopper valve/bake region
- Steve - Hall A laser, LLRF gone early June
- Max - ready for beam tests?
- Riad - 200 kV Wien - 20 Amp PS, update on Moller tasks (IA, RPT, grounding), Keithley 485 picoameter
- Shukui - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
Upcoming meetings/travel/presentations
- May
- 5-13, IPAC'23 contributions (Greg, Aziz, Andriy, Joe, Reza, Amy)
- 15, 2023 CCM & IMEKO TC16 7th International Conference on Pressure and Vacuum Metrology (Marcy)
- 15-19 LCWS (Andriy, Carlos)
- Jun
- USPAS (Max)
- 5-9 APS DAMOP Meeting (Riad, Matt G.)
- 28, JLab User Group e+ update (Joe)
- Jul
- Summer student PES talk (Riad)
- Summer student e+ talk (Yves)
- Aug
- ?
- Sep
- IBIC (Max)