Difference between revisions of "Bubble Chamber Meeting Wednesday January 20, 2016"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We will meet in TL 2221 on Wednesday January 20 at 3:30 pm EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == ...")
 
 
(24 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
  Phone number: 1-888-240-2560
 
  Phone number: 1-888-240-2560
 
  Meeting ID: 3528502673#
 
  Meeting ID: 3528502673#
Moderator Passcode: 5978#
 
 
  Meeting URL: http://bluejeans.com/3528502673
 
  Meeting URL: http://bluejeans.com/3528502673
  
Line 10: Line 9:
 
'''Agenda:'''  
 
'''Agenda:'''  
  
1- Bubble Chamber work at ANL
+
1- GEANT4 Simulation:
 +
# Gamma Flux: [[media:G4Flux_Sept2015.pdf]] [[media:G4Flux_Sept2015.pptx]]
 +
# Expected Rates:
 +
## <sup>18</sup>O(γ,α)<sup>14</sup>C with no ThrCut: [[media:O18ga_rate_G4.txt]]
 +
## <sup>17</sup>O(γ,n)<sup>16</sup>O with:
 +
### ThrCut = 90 keV: [[media:O17gn_rate_G4_90keV.txt]]
 +
### ThrCut = 130 keV: [[media:O17gn_rate_G4_130keV.txt]]
 +
## <sup>14</sup>N(γ,p)<sup>13</sup>C with:
 +
### ThrCut = 20 keV: [[media:N14gp_rate_G4_20keV.txt]]
 +
### ThrCut = 50 keV: [[media:N14gp_rate_G4_50keV.txt]]
  
2- Summary of Sept Beam Test
 
  
3- Sept beam test data analysis
+
2- Sept beam test data analysis: [[media:Analyses_Rashi_Jan2016.pdf]] [[media:Analyses_Rashi_Jan2016.pptx]]
  
4- Discussion of June 2016 beam test
+
3- Discussion of June 2016 beam test
  
5- New beamline design with sweep magnet
+
 
 +
 
 +
 
 +
----
 +
 
 +
'''Notes from this meeting:'''
 +
 
 +
* In the simulation, the collimator inner radius is correct (8.0 mm).
 +
 
 +
* Bubble chamber simulation remaining tasks:
 +
# Complete geometry: add stainless steel cube and flanges
 +
# Add electron beam energy spread and beam size
 +
# Measure fraction of photons that are absorbed in the N<sub>2</sub>O target as a function of E<sub>γ</sub>
 +
 
 +
* Next Bubble Chamber beam test will measure <sup>19</sup>F(γ,α)<sup>15</sup>N
 +
 
 +
* Old fluorine chamber has a height of 36 inches. Beamline height on the concrete platform is 27 inches. Beamline height before the platform is 42 inches.

Latest revision as of 15:00, 24 January 2016

We will meet in TL 2221 on Wednesday January 20 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- GEANT4 Simulation:

  1. Gamma Flux: media:G4Flux_Sept2015.pdf media:G4Flux_Sept2015.pptx
  2. Expected Rates:
    1. 18O(γ,α)14C with no ThrCut: media:O18ga_rate_G4.txt
    2. 17O(γ,n)16O with:
      1. ThrCut = 90 keV: media:O17gn_rate_G4_90keV.txt
      2. ThrCut = 130 keV: media:O17gn_rate_G4_130keV.txt
    3. 14N(γ,p)13C with:
      1. ThrCut = 20 keV: media:N14gp_rate_G4_20keV.txt
      2. ThrCut = 50 keV: media:N14gp_rate_G4_50keV.txt


2- Sept beam test data analysis: media:Analyses_Rashi_Jan2016.pdf media:Analyses_Rashi_Jan2016.pptx

3- Discussion of June 2016 beam test




Notes from this meeting:

  • In the simulation, the collimator inner radius is correct (8.0 mm).
  • Bubble chamber simulation remaining tasks:
  1. Complete geometry: add stainless steel cube and flanges
  2. Add electron beam energy spread and beam size
  3. Measure fraction of photons that are absorbed in the N2O target as a function of Eγ
  • Next Bubble Chamber beam test will measure 19F(γ,α)15N
  • Old fluorine chamber has a height of 36 inches. Beamline height on the concrete platform is 27 inches. Beamline height before the platform is 42 inches.