Difference between revisions of "Bubble Demo ME May 9, 2014"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We will meet Friday May 9 @ 9am in TL-2236. == SUMMER Installation == '''DL Items''' : Are DL drawings signed off? : Identify vendor for DL? : Identify vendor for DL alignment...")
 
 
(11 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
== SUMMER Installation ==
 
== SUMMER Installation ==
 
'''DL Items'''
 
'''DL Items'''
: Are DL drawings signed off?
+
: (Shaun/Joe) Finalize/sign drawings => Done?
: Identify vendor for DL?
+
: (Tim) Identify vendor for DL? => PR#343083 to get quotes from Alpha Magnetics, New England Technicoil, Stangnes Industries
: Identify vendor for DL alignment plate?
+
: (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate => Shaun will ask Tim to be made...
  
 
'''Beamline layout'''
 
'''Beamline layout'''
: Bellows arrangement
+
: (Shaun) Send Joe copy of layout => Done
: Modify support of "green" girder
+
: (Joe) Help categorize component inventory => Joe sit w/ Phil make list
: Plan/schedule for drawings and fabrication
+
:: re-use from tunnel, on shelf, buy part, design/fab part
: Aluminum photon dump dimensions
+
: (Shaun) Bellows arrangement => Bellows added, need support at end of first bellows.
 +
: (Shaun) Modify support of "green" girder => Done, looks good.
 +
: (Shaun) Plan/schedule for drawings and fabrication => Couple days of effort.  Riad would like layout by Wed14th.
 +
: (Riad) Aluminum photon dump dimensions => Riad still working this prob
  
Beamline components
+
'''Beamline components'''
: Are MBH corrector strengths sufficient?
+
: (Joe) Are MBH corrector strengths sufficient? => 4 Haimson pairs will work
 +
:: [[media:140502_Bubble_Haimson.docx]] [[media:140502_Bubble_Haimson.pdf]]
  
Bubble Chamber Alignment
+
: (Joe M.) Is radiator cooling flange sufficient? => Shaun will work new concept.  Joe M. will make new assessment.
: Mounting in tunnel
+
:: [[media:140508_RadiatorConcept.pptx]] [[media:140508_RadiatorConcept.pdf]]
: Chamber alignment capability
+
 
 +
'''Bubble Chamber Alignment'''
 +
: (Riad/Brad/Shaun) Mounting in tunnel
 +
: (Riad/Brad/Shaun) Chamber alignment capability
 +
:: [[media:140508_MountBubble.docx]] [[media:140508_MountBubble.pdf]]
  
 
== FINAL installation ==
 
== FINAL installation ==
 
: Identify suitable dump dipole and its dimensions
 
: Identify suitable dump dipole and its dimensions

Latest revision as of 09:44, 8 May 2014

We will meet Friday May 9 @ 9am in TL-2236.

SUMMER Installation

DL Items

(Shaun/Joe) Finalize/sign drawings => Done?
(Tim) Identify vendor for DL? => PR#343083 to get quotes from Alpha Magnetics, New England Technicoil, Stangnes Industries
(Tim/Joe/Shaun ?) Identify vendor for DL alignment plate => Shaun will ask Tim to be made...

Beamline layout

(Shaun) Send Joe copy of layout => Done
(Joe) Help categorize component inventory => Joe sit w/ Phil make list
re-use from tunnel, on shelf, buy part, design/fab part
(Shaun) Bellows arrangement => Bellows added, need support at end of first bellows.
(Shaun) Modify support of "green" girder => Done, looks good.
(Shaun) Plan/schedule for drawings and fabrication => Couple days of effort. Riad would like layout by Wed14th.
(Riad) Aluminum photon dump dimensions => Riad still working this prob

Beamline components

(Joe) Are MBH corrector strengths sufficient? => 4 Haimson pairs will work
media:140502_Bubble_Haimson.docx media:140502_Bubble_Haimson.pdf
(Joe M.) Is radiator cooling flange sufficient? => Shaun will work new concept. Joe M. will make new assessment.
media:140508_RadiatorConcept.pptx media:140508_RadiatorConcept.pdf

Bubble Chamber Alignment

(Riad/Brad/Shaun) Mounting in tunnel
(Riad/Brad/Shaun) Chamber alignment capability
media:140508_MountBubble.docx media:140508_MountBubble.pdf

FINAL installation

Identify suitable dump dipole and its dimensions