== Agenda ==
 
== Agenda ==
  
* Joe (5) JLAAC talks [[media:JLab_AAC_Agenda_Mar2023.pdf]]
+
* Joe (5)
* Carlos/all (25) Gun and SAD jobs [[Media:Gun swap planning 1 week before and 1 week after SAD start.pptx]]
+
** JLAAC dry runs next week, maybe 3/3 [[media:JLab_AAC_Agenda_Mar2023.pdf]]
 +
** LDRD will be announced soon, will prioritize Jlab upgrades (22 GeV/e+)
 +
** Nate proposing significant BPM upgrade, if you want to be at the table (Riad?, Max?)
 +
** Response to ARDAP LOI due today...
 +
* Carlos/all (25) Gun and SAD jobs  
 +
** Gun install schedule update [[Media:Gun swap planning ver Apr 4 2023.pptx]]
 +
**[[Media:Gun swap planning 1 week before and 1 week after SAD start.pptx]]
 +
** (Max) 200 kV gun optics and 2I steering - https://tasklists.jlab.org/bslist/tasks/108544
 +
** (Max) 200 keV Wien filter optics - https://tasklists.jlab.org/bslist/tasks/108547
 +
** (Max) Test IHA0I02 after maintenance - https://tasklists.jlab.org/bslist/tasks/108546
 
* All (30) Your research projects, deadlines, papers, etc.
 
* All (30) Your research projects, deadlines, papers, etc.
 +
** (Max) Very different focal lengths of the gun field at CEBAF now vs. R30-3
 +
*** Cathode-grid scan, orbit measured with BPMs: fake single-particle scan for comparison with simulation
 +
*** CEBAF gun, measured Jan 18: [[Media:Gunkick_cebaf_measured_trajectories.pdf|trajectories (extrapolated)]], [[Media:Gunkick_cebaf_measured_spread.pdf|aggregated to RMS]], [[Media:Gunkick_cebaf_measured_focus.pdf|focal length]]
 +
*** CEBAF gun, GPT: [[Media:Gunkick_cebaf_gpt_trajectories.pdf|trajectories]], [[Media:Gunkick_cebaf_gpt_spread.pdf|aggregated to RMS]], [[Media:Gunkick_cebaf_gpt_focus.pdf|focal length]]
 +
*** R30-3 gun, GPT: [[Media:Gunkick_r30_gpt_trajectories.pdf|trajectories]], [[Media:Gunkick_r30_gpt_spread.pdf|aggregated to RMS]], [[Media:Gunkick_r30_gpt_focus.pdf|focal length]]
 +
*** cannot be extrapolated to high space charge
 +
  
 
=== Upcoming Meetings/Dates ===
 
=== Upcoming Meetings/Dates ===

Latest revision as of 10:42, 4 April 2023

Agenda


Upcoming Meetings/Dates

  • February 22 (noon), G. Blume (20) Commissioning of the Compton transmission polarimeter (SRF Gun meeting)
  • March 2 (11am), Y. Zhou, "Photoemission from biased metal surfaces”, Accelerator Division Seminar
  • March 7-8, U. Va. Positron Working Group Meeting, Charlottesville - https://indico.jlab.org/event/680/
    • Joe Grames (20+5) - Ce+BAF concept and the challenging polarized e- source
    • Andriy Ushakov (15+5) - Positron target design and fatigue studies
    • Sami Habet (15+5) - Concept of a polarized positron injector for CEBAF
    • Dennis Turner (15+5) - Delivering e+ beams from LERF through Ce+BAF
  • March 15, GSRA Annual Review (1-4 pm)
  • March 23-24, KEK visit Yoshinori+
  • May 7-12, IPAC'23