Difference between revisions of "Gun Test Stand Meeting Minutes and To-Do Lists"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
'''2015''' | '''2015''' | ||
+ | |||
+ | :[[GTS meeting 11_03_15]] SYSTEM IS UNDER VACUUM!!!. | ||
:[[GTS meeting 10_27_15]] Sheep chamber saga, electrode assembly update. | :[[GTS meeting 10_27_15]] Sheep chamber saga, electrode assembly update. |
Revision as of 14:22, 3 November 2015
Gun Test Stand Meetings
2015
- GTS meeting 11_03_15 SYSTEM IS UNDER VACUUM!!!.
- GTS meeting 10_27_15 Sheep chamber saga, electrode assembly update.
- GTS meeting 10_20_15 Update on sheep chamber vacuum setup, electrodes and RadCon.
- GTS meeting 10_06_15 Update on sheep chamber vacuum setup and electrode polishing.
- GTS meeting 9_25_15 Update from Yan on fields from John's Shed, update on sheep chamber vacuum setup and electrode polishing.
- GTS meeting 9_15_15 Met at the GTS with Danny and Josh, Sheep chamber attached to gun valve.
- GTS meeting 9_8_15 350 kV vs 500 kV guns, Yan poisson field maps
- GTS meeting 9_1_15 More discussion, optimized sheds and plan y and z
- GTS meeting 8_25-15 More discussion re: shed optimization for gun Plan Z
- GTS meeting 8_18_15 Global GTS talking points, the big picture, VA beamline etc., to do list
- GTS meeting 8_11_15 More poisson results, discuss revisiting the white R30 insulator + shed test
- GTS meeting 8_4_15 Yan's poisson results, Danny's latest drawing, electrode inventory, insulator inventory
- GTS meeting 7_14_15 discuss gun Plan Z
- GTS meeting 7_7_15 kick off and to-do list, review Carlos' HV results
media:Carlos' HV insulator paper_IEEE preprint.pdf