Difference between revisions of "May 26, 2017 - 200kV gun upgrade meeting"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "===200kV Gun=== * Task and Timeline Gantt chart => media:170421_CHG.pdf ===325kV Gun .... WHAT ?!?!?=== * media:170519_325kV_simulations.pdf => Did we talk about this...")
 
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
=== Summer 2017 SAD Update ===
 +
:[[media:SADCIS_v6.docx]]
 +
 
===200kV Gun===
 
===200kV Gun===
 
* Task and Timeline Gantt chart => [[media:170421_CHG.pdf]]
 
* Task and Timeline Gantt chart => [[media:170421_CHG.pdf]]
 +
:Simulation of the effect of the mesh and the perforated plate [[media:170525_Mesh.pdf]]
  
===325kV Gun .... WHAT ?!?!?===
+
=== NEG Tube===
* [[media:170519_325kV_simulations.pdf]] => Did we talk about this last week?
+
: We are making 4 BPM's
 
+
: Shop has materials now and machining (#327755)
===Gun2 NEG Tube===
+
: ...then Phil will pick up for weld, 400C bake, leak check, clean, NEG coat
* Final NEG tube design => [[media:NEGTUBE_MAY03.pdf]]
+
: ...then Pete will perform optical/electrical checks
: Ordered (6) 4.5" rotatable, 2-1/2" bore => (2) in hand, (4) on back order
+
: ...then John will perform Gabou map
: Ordered 6" to 4-1/2" reducers =>
+
::Final NEG tube design => [[media:NEGTUBE_MAY03.pdf]]
: (3) FH sent to MMF => One will be read for NEG tube by next Friday 5/26, others week after
 
::a) check/replace coil leads w/ 240C insulator as needed, some have old shrink wrap
 
::b) hi pot each coil
 
::c) measure each coil using HMIN/HMAX -2.5A/+2.5A
 
::d) Bz v. z at r=0 ALL (and r=2,4,6 mm for ONE)
 
::e) Bz v. I at r=0,z=0 ALL
 
* BPM process :  Fabricate, Clean, Leak Test, Optical Align, Electrical Acceptance and/or Gabou Line, Install
 
:: Pete Francis performing optical/electrical acceptance testing...
 
:: M20 #1 (Musson tested) - > First M20 with no serial number optically looks bad and did not pass acceptance test.
 
:: M20 #2 (Musson tested) -> Second M20 with serial no. #PM20-127  looks ok...... but probably could use an Optical Alignment
 
:: M20 #3 (Greg Marble spare) -> Third M20 tested great
 
:: M20 #4 (Greg Marble spare) -> Fourth M20 test occurred during electrical interference, re-test on Monday
 
* What next?
 
: Send to shop for modification (327755) => Request June 9
 
 
::M20 Old Assembly Modification [[media:0990.pdf]]
 
::M20 Old Assembly Modification [[media:0990.pdf]]
 
::M20 New Assembly Can [[media:0991.pdf]]
 
::M20 New Assembly Can [[media:0991.pdf]]
 
::M20 New Assembly 6.00 x 4.500 reducer flange[[media:0.992.pdf]]
 
::M20 New Assembly 6.00 x 4.500 reducer flange[[media:0.992.pdf]]
: Leak check
 
: Repeat optical/electrical acceptance
 
: NEG coat
 
: Gabou measurement
 
: Install
 
  
===Gun3 Removal and Diagnostics Chamber Installation ===
+
===Diagnostics Chamber Installation ===
* May 8-12 => [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 Remove and replace Gun3 ATLIS task]
+
: Second bake and activate week of May 30th => [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 Remove and replace Gun3 ATLIS task]
: Rebake week of May 30th
+
: Remove VBV3I02 from special interlock and swap PLC for relays
  
=== Eliminating Gun Switch Software ===
+
===TOSP/Spellman HVPS update===
* April 28 => [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17327 Remove gun switch software ATLIS task]
+
:UITF [[media:UITF-TOSP.pdf]] [[media:UITF-THA.pdf]]
: Software removed and interlocks tested [https://logbooks.jlab.org/entry/3471335 ELOG entry]
 
: Yet to do a) remove VBV3I02 from special interlock and b) swap PLC for relays
 
 
 
===Spellman HVPS update===
 
 
 
===Radmon update===
 
:[https://logbooks.jlab.org/entry/3473167 Installed at CEBAF]
 
:[https://logbooks.jlab.org/entry/3473203 Checked and ready]
 
 
 
=== Summer 2017 SAD Update ===
 
:[[media:SADCIS_v6.docx]]
 

Latest revision as of 10:05, 26 May 2017

Summer 2017 SAD Update

media:SADCIS_v6.docx

200kV Gun

Simulation of the effect of the mesh and the perforated plate media:170525_Mesh.pdf

NEG Tube

We are making 4 BPM's
Shop has materials now and machining (#327755)
...then Phil will pick up for weld, 400C bake, leak check, clean, NEG coat
...then Pete will perform optical/electrical checks
...then John will perform Gabou map
Final NEG tube design => media:NEGTUBE_MAY03.pdf
M20 Old Assembly Modification media:0990.pdf
M20 New Assembly Can media:0991.pdf
M20 New Assembly 6.00 x 4.500 reducer flangemedia:0.992.pdf

Diagnostics Chamber Installation

Second bake and activate week of May 30th => Remove and replace Gun3 ATLIS task
Remove VBV3I02 from special interlock and swap PLC for relays

TOSP/Spellman HVPS update

UITF media:UITF-TOSP.pdf media:UITF-THA.pdf