May 3, 2019
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
We'll meet in TL-1227 on Friday May 3 @ 11am.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 693750184# Meeting URL: https://bluejeans.com/693750184 Moderator ID: 2864
- SAD and Summer Run Schedule
- Today through summer run media:190503_PREXII_Planning.pptx
- Steve's SAD calendar - https://accweb.acc.jlab.org/calendar/
- List of ATLIS tasks - https://wiki.jlab.org/ciswiki/index.php/Spring_SAD_2019
- Pre-Beam Jobs
- PQB screen shots of control screens - https://logbooks.jlab.org/entry/3681125
- Laser configuration (ABCD)
- Helicity board configuration
- PQB laser configuration
- Activate photocathode & QE scan
- Configure for anode bias
- Beam Jobs to FC#1
- Pick all save for restoration, move to new spot, restore orbit
- Set photocathode rotation (few access to roll puck, then PQB measurement to where? to finalize orientation)
- Study and then fix anode bias for 0V, 500V, 1000V (TOF using chopper, beam size or emittance scan using solenoids)
- ABC transmission setup w/ which? flipper choice (either makes transverse polarization) + HWien ~ 16 deg.
- What PQB beam measurements to make?
- Beam Jobs to FC#2
- Initial restoration to FC#2
- Carry on w/ ABC setup (finalize flipper choice here, maybe?)
- Mott measurement to precisely finalize spin rotators (VWien and Solenoids)
- Iterate w/ ABC setup, to FC#2
- What PQB beam measurements to FC2 (can be high current)
- Beam Jobs to ILD, and beyond...
- Initial restoration to ILD
- Scaling RF and injector magnets, energy/injector beam setup
- Complete ABC setup to ILD
- M56/PQB measurement to ILD?
- Beam to Halls
- What is prioritize/sequence for jobs, e.g. when does spin dance happen?
- Punchlist
- FC2 air cylinder needs to be replaced
- Regular RTP rise time procedure (how often?, as-is manual or automated?)
- Insertable lens (is alarm sufficient, or disconnect IN/OUT control?)