Meeting 9/8/22 - COMTRA
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
- Thursday's @ 9am EDT by Zoom
- Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09
- Zoom ID: 160 190 6056 and Passcode: 992019
New UITFList entries
- General COMTRA installation => https://tasklists.jlab.org/uitflist/tasks/107371
- DC power magnet install => https://tasklists.jlab.org/uitflist/tasks/107370
Readiness Updates
- ME/vacuum component layout/shielding
- Updated ME model w/ dimensions (collimator length, insertable aperture, stand points)
- Vacuum assembly later today (add aperture, spool, reducer, ceramic, dump)
- Schedule S&A as-found
- Max - names/dimensions for beam line elements
- Mike - update songsheet w/ names
- Detector table/shielding
- Waiting on table top, then rails/posts assembly
- Drawings for lead hut assembly
- Detector status
- Detector Triax (4) and SHV (2) => cables pulled and hanging near dump
- DAQ status
- Assemble BGO/PMT and detector chassis
- Magnet
- Magnet QA, measurement/model benchmarking, readiness for installation
- Magnet PS cables => pulled to power load on wall
- Rack/magnet ground cable => bounded to braid near dump
- Current monitoring
- Faraday cups current monitor => Ganged with FCUP
- A5 current monitor => 7mm aperture, requires I&C controls (Windham next week)
- A6 current monitor => Radiator
- Beam Position/Size diagnostics upstream of Dump
- Harp installed upstream of dump
- BPM installed upstream of dump
- Beam line viewer => Matt repaired, requires camera alignment
- X-ray viewer => Joe relocated to look at detector hut, requires X-ray card
- SImulations
- Greg - Update model to include positions of FCUP, Aperture, Tube, Dump, Shielding
- Max - Beam size model at 5 MeV
DAQ
- DAQ install at UITF media:220817_DAQ_PREP.pptx
Beamline
- Layout for RadCon media:Compton Layout for Radcon Shielding 8-10-22-3.pptx
- Spool flanges media:Flanges and Reducer for Compton and RF Kicker-jmg.xlsx
- Radiator - (1) on-hand, (1) need for BNL thumb
- Stands PR Shop Job
- Lead for UITF - (11) 2 X 4 X 4, (2) 2 X 4 X 6, (99) 2 X 4 X 8 thumb
Magnet
- Kepco PS - ship 8/31 2 day air => PR
- Magnet EMC PR#1PR#2 coil thumb
Detector
- Bases - due 9/15 - comes with Thi in September
- Collimator - (2) on-hand media:JL0015777_Cu_collimator.pdf thumb
- Absorbers - (6) on-hand media:Absorber - 240 D 001 14_V4.pdf thumb
- Boxes - (2) on hand thumb
- BGO - (2) on-hand thumb thumb thumb thumb thumb
- PMT and mu shields - (4) on-hand thumb
Documentation
- NIM - Elsevier Article (elsarticle) template => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
- Manual - Sharepoint