Difference between revisions of "KPP Run"
Jump to navigation
Jump to search
Line 92: | Line 92: | ||
* When hall is in "Beam Permit" | * When hall is in "Beam Permit" | ||
** Ramp torus to 10% of max current (380A) | ** Ramp torus to 10% of max current (380A) | ||
+ | ** Turn tagger magnet ON if beam tune on the tagger dump or tagger yoke dump will be needed (it will be needed if beam comes back after several hours of down) | ||
** Turn all beamline devices ON, turn all CLAS12 detectors OFF | ** Turn all beamline devices ON, turn all CLAS12 detectors OFF | ||
Revision as of 20:57, 2 February 2017
[edit]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 KPP run, February 3 to March 3
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for February 2 - 3, 2017 :The Hall was closed and brought to controlled access at 8pm on Thursday, February 2Locking up the hall
Establish beam to the tagger yoke dump
Bring beam to FC:
At this point call DAQ, EC, DC, and FTOF experts, notify them that beam is ready for data taking
Important Notes:
|
General Instructions:DAQ RECOVERYIf DAQ crashed/broken: call DAQ on-call cell phone. Establishing Acceptable Beam Conditions:
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |