Difference between revisions of "Run Group A"

From clas12-run
Jump to navigation Jump to search
Line 86: Line 86:
 
| valign=top width=50% |
 
| valign=top width=50% |
  
== <font color=blue>''' Run Plan: March. 31 - April 1, 2019'''</font>==
+
== <font color=blue>''' Run Plan: April 2-3, 2019'''</font>==
 
(Last updated: March 31, 2019 @ 3:05 p.m.)
 
(Last updated: March 31, 2019 @ 3:05 p.m.)
  
Line 111: Line 111:
 
* Take low current production at 10 nA for 4 hr.
 
* Take low current production at 10 nA for 4 hr.
 
-->
 
-->
* Take production data at 50 nA in 4 hr runs until beam studies on Monday
+
* Take production data at 50 nA in 4 hr runs
 +
* ~1 hour RF Recovery during Hall D access planned for 1:30pm-2:30pm
 +
* Call RC when beam is available
 +
* Make sure all all detectors (MVT in safe mode) and take 5 nA to faraday cup. Check halo rates and beam position, then take a harp scan at 2H01 to see if beam is acceptable. Confirm with RC and beamline expert. Make a log entry.
 +
* Take production data at 50 nA in 4 hr runs
  
  

Revision as of 10:42, 2 April 2019

[edit]


Clas12design.png